49
E
PREPARATION
1. Remove:
• Steering hook
1
or lock plate
1
2. Remove:
• Bolts
1
• Grommet holder
2
• Grommet
3
• Bolt
4
• Cable stopper
5
• Grommet
6
• Battery cable
1
2
3
4
5
6
INSTALLATION
1. Install:
• Tiller handle assembly
1
• Self-locking nuts
2
NOTE:
Do not kink the speedometer hose.
2. Install:
• Grommet
1
• Variable trolling RPM switch lead
2
• Wiring harness
3
• Battery cable
4
• Warning indicator lead
5
NOTE:
Align the taped end
a
of the battery cable with
the end of the grommet
1
.
T
R
.
.
Self-locking nut:
40.0 N • m
(4.0 kgf • m, 29.5 ft • lb)
1
2
3
4
5
1
a
TillerHandle.book Page 49 Friday, April 12, 2013 3:19 PM