Pre-operation checks
70
Securely install the stern drain plugs by tight-
ening them until they stop.
EJU43810
Hood check
Push down the hood latch and make sure
that it is securely closed.
EJU40146
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 73 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU41811
Cooling water pilot outlet check
Make sure that water is discharged from the
port (left) cooling water pilot outlet while the
engine is running. (See page 35 for informa-
tion on the cooling water pilot outlets.)
EJU32715
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 43 for in-
formation on proper operation of the multi-
function information center.)
EJU43392
Shift system check
Operate the throttle lever and RiDE lever, and
check that the watercraft moves or does not
move according to the displayed shift indica-
tor. (See page 37 for shift system operation
procedures.)
WARNING! To avoid colli-
sions, operate at safe speeds and keep a
1
Stern drain plug
1
UF3P12E0.book Page 70 Monday, July 23, 2018 9:51 AM