
FRONT CONSTANT VELOCITY SHAFT ASSEMBLIES, DIFFEREN-
TIAL ASSEMBLY AND FRONT DRIVE SHAFT
8-9
EBS30240
DISASSEMBLING THE FRONT CONSTANT
VELOCITY SHAFT ASSEMBLIES
The following procedure applies to both of the
front constant velocity shaft assemblies.
1. Remove:
• Boot bands
• Clip “1”
• Double offset joint “2”
• Circlip “3”
• Ball bearing “4”
• Dust boot “5”
TIP
Before removing the clip, slide the dust boot
away from the double offset joint.
2. Remove:
• Boot band “1”
Use the boot band installation tool “2”.
3. Remove:
• Dust boot
• Constant velocity joint
• Clip
TIP
Secure the constant velocity shaft in a vise, and
then remove the constant velocity joint using
hammers.
EBS30241
CHECKING THE FRONT CONSTANT
VELOCITY SHAFT ASSEMBLIES
The following procedure applies to both of the
front constant velocity shaft assemblies.
1. Check:
• Double offset joint splines
• Constant velocity joint splines
• Constant velocity shaft splines
Wear/damage
→
Replace.
2. Check:
• Dust boots
Cracks/damage
→
Replace.
NOTICE
ECB01590
Always use a new boot band.
3. Check:
• Balls and ball races
• Inner surface of double offset joint
Pitting/wear/damage
→
Replace.
A. Differential side
Boots band installation tool
90890-01526
Boots band installation tool
YM-01526
5
1
2
A
4
3
A
B. Wheel side
B. Wheel side
1
2
B
B
Summary of Contents for 2016 Grizzly yf700gg
Page 6: ......
Page 8: ......
Page 11: ...IDENTIFICATION 1 2 ...
Page 37: ...ENGINE SPECIFICATIONS 2 6 Air induction system Solenoid resistance 18 22 Ω ...
Page 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EBS30023 LUBRICATION DIAGRAMS 6 7 8 9 3 4 3 2 1 5 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 1 2 3 4 5 ...
Page 62: ...COOLING SYSTEM DIAGRAMS 2 31 EBS20021 COOLING SYSTEM DIAGRAMS 1 2 3 10 9 8 6 7 5 4 ...
Page 78: ...CABLE ROUTING 2 47 Front and rear brake hoses F 3 F 3 F 3 3 I G H 4 4 B C D 2 E D 2 A 1 ...
Page 80: ...CABLE ROUTING 2 49 ...
Page 83: ......
Page 119: ...PERIODIC MAINTENANCE 3 36 A Headlight left and right B Handle mounted light b a 1 A b a 1 B ...
Page 120: ...PERIODIC MAINTENANCE 3 37 ...
Page 197: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 74 7 9 8 9 7 3 5 4 5 3 6 2 10 10 1 ...
Page 198: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 75 ...
Page 203: ...ENGINE INSPECTION 5 2 Top cover Refer to GENERAL CHASSIS 2 on page 4 6 ...
Page 244: ...ELECTRIC STARTER 5 43 a b b 1 2 3 ...
Page 316: ...AIR INDUCTION SYSTEM 7 9 EBS20057 AIR INDUCTION SYSTEM 3 4 1 2 3 4 1 2 ...
Page 352: ...REAR CONSTANT VELOCITY SHAFT ASSEMBLIES FINAL DRIVE ASSEMBLY AND REAR DRIVE SHAFT 8 31 ...
Page 355: ......
Page 365: ...ELECTRIC STARTING SYSTEM 9 10 ...
Page 369: ...CHARGING SYSTEM 9 14 ...
Page 417: ...FUEL PUMP SYSTEM 9 62 ...
Page 434: ...ELECTRICAL COMPONENTS 9 79 1 2 3 5 7 8 9 10 11 12 13 14 15 16 17 18 19 4 6 ...
Page 454: ...ELECTRICAL COMPONENTS 9 99 ...
Page 468: ......
Page 469: ......
Page 470: ......