CHAS
FRONT BRAKE
7-18
4.
Assemble:
• The dust seal
• The brake pump
5.
Assemble:
• The line
• The copper washers
• The coupling screw
s
s
WARNING
Always use new copper washers
6.
Assemble:
• The brake switch
• The brake lever
NOTE:
Apply lithium soap grease to the brake lever
rotation spindle
Screws (pump support) :
0.9 kg • m
Coupling screws:
2.6 kg • m
Summary of Contents for 2003 TZR50
Page 1: ...SERVICE MANUAL TZR50 X POWER 03 5WX AE1 03 ...
Page 7: ...GEN INFO 1 ...
Page 17: ......
Page 18: ...SPEC 2 ...
Page 38: ......
Page 39: ...INSP ADJ 3 ...
Page 78: ...ENG 4 ...
Page 122: ......
Page 123: ...COOL 5 ...
Page 136: ...CARB 6 ...
Page 144: ......
Page 145: ...CHAS 7 ...
Page 197: ......
Page 198: ...ELEC 8 ...
Page 200: ......
Page 201: ...ELEC ELECTRICAL DIAGRAM 8 2 ELECTRICAL DIAGRAM ...
Page 211: ...ELEC CHARGING SYSTEM 8 12 CHARGING SYSTEM CIRCUIT DIAGRAM ...
Page 216: ......
Page 217: ...ELEC LIGHTING SYSTEM 8 18 LIGHTING SYSTEM CIRCUIT DIAGRAM ...
Page 227: ...ELEC SIGNALING SYSTEM 8 28 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 244: ......
Page 245: ...ELEC COOLING SYSTEM 8 46 COOLING SYSTEM CIRCUIT DIAGRAM ...
Page 250: ......