COOL
THERMOSTAT AND RADIATOR
5-9
INSPECTION
1.
Inspect:
• The radiator core
Obstruction
Eliminate this with com-
pressed air, blowing from the rear of the
radiator.
Squashed fins
repair / replace
2.
Inspect:
• The inlet hose
Cracks / damage
Replace
• Output sleeve
Cracks / Damage
Replace
3.
Measure:
• The opening pressure of the radiator cap
Measurement steps:
• Connect the tester
of the cooling sys-
tem and the adapter
to the radiator cap
.
• Apply the specified pressure for ten
seconds and make sure that this does not
drop.
4.
Inspect:
• The thermostat
See the section on “DISMANTLING THE
ENGINE” in CHAPTER 4 CYLINDER
HEAD AND CYLINDER
The valve does not open
replace
Radiator cap opening pressure:
0.75 ~ 1.05 kg/cm
2
Cooling system tester:
90890 - 01325
Adapter:
90890 - 01352
Summary of Contents for 2003 TZR50
Page 1: ...SERVICE MANUAL TZR50 X POWER 03 5WX AE1 03 ...
Page 7: ...GEN INFO 1 ...
Page 17: ......
Page 18: ...SPEC 2 ...
Page 38: ......
Page 39: ...INSP ADJ 3 ...
Page 78: ...ENG 4 ...
Page 122: ......
Page 123: ...COOL 5 ...
Page 136: ...CARB 6 ...
Page 144: ......
Page 145: ...CHAS 7 ...
Page 197: ......
Page 198: ...ELEC 8 ...
Page 200: ......
Page 201: ...ELEC ELECTRICAL DIAGRAM 8 2 ELECTRICAL DIAGRAM ...
Page 211: ...ELEC CHARGING SYSTEM 8 12 CHARGING SYSTEM CIRCUIT DIAGRAM ...
Page 216: ......
Page 217: ...ELEC LIGHTING SYSTEM 8 18 LIGHTING SYSTEM CIRCUIT DIAGRAM ...
Page 227: ...ELEC SIGNALING SYSTEM 8 28 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 244: ......
Page 245: ...ELEC COOLING SYSTEM 8 46 COOLING SYSTEM CIRCUIT DIAGRAM ...
Page 250: ......