Commissioning
VARiON
®
Plus
700 IQ H
14
ba76207e02
12/2020
3.2.3
Measurement electrodes and compensation electrodes
Commissioning
Fig. 3-2
Measurement or compensation electrode with storing aids
In the delivery condition, each electrode is equipped with a watering
cap and a nut that protects the screw-in thread. Prior to installation, first
remove the watering cap and, using the special hexagon key, unscrew
the electrode from the nut. Keep both storing aids in case you want to
store the electrode.
Notes on storage
If you will not use the electrode for a longer period of time, screw the
electrode into the nut as far as it will go. Soak the foam insert in the
watering cap with VARiON
®
/ES-1 standard solution (lower concentra-
tion) and plug the electrode into the watering cap.
The membrane of the electrode must not
dry up (follow notes on storage)
be damaged
be brought into contact with grease.
Watering cap
Electrode
Nut
Sealing ring
NOTICE
Make sure to use the correct solution for the watering
cap (VARiON®/ES -1 standard solution). If you use the
watering solution of the reference electrode instead the
function of the electrode can be seriously damaged.