DB600 Buoy
QUICK START GUIDE
Quick Start Guide
YSI Systems
•
XA00101
Items Required During Assembly
• Saftey Goggles
• Work Gloves
• Standard Flat & Phillips Head Screw Drivers
• Metric Wrenches: 10 mm, 13 mm, 16 mm
The
DB600 Quick Start Guide
is intended to provide you with the basic steps needed to set up your buoy after unpacking
it. This Guide will walk you through the steps of physically assembling your buoy, affixing the All-in-One (Ai1) Logging &
Communications system, attaching the mooring, connecting your sonde, and finally connecting via HydroSphere (where
applicable). Before starting any of these steps, please visually inspect your system for any damage that may have occurred
during shipment.
Ai1 Telemetry
Station
4 x M6 holes on top
to mount lantern
Locking pin
Bottom
bracket
Top bracket
Figure 1:
Diagram explaining the components of the DB600 Buoy
Deployment Tube
(houses sonde)
Mooring line
connection point
• Metric Allen Wrenches: 5 mm, 6 mm, 8 mm
• O-Ring Grease
• Customer supplied padlock