background image

DB600 Buoy

QUICK START GUIDE

Quick Start Guide

YSI Systems

 

 

XA00101

Items Required During Assembly

 

•  Saftey Goggles
•  Work Gloves
•  Standard Flat & Phillips Head Screw Drivers
•  Metric Wrenches: 10 mm, 13 mm, 16 mm

The 

DB600 Quick Start Guide

 is intended to provide you with the basic steps needed to set up your buoy after unpacking 

it.  This Guide will walk you through the steps of physically assembling your buoy, affixing the All-in-One (Ai1) Logging & 
Communications system, attaching the mooring, connecting your sonde, and finally connecting via HydroSphere (where 
applicable).  Before starting any of these steps, please visually inspect your system for any damage that may have occurred 
during shipment.

Ai1 Telemetry 
Station

4 x M6 holes on top 
to mount lantern

Locking pin

Bottom 
bracket

Top bracket

Figure 1: 

Diagram explaining the components of the DB600 Buoy

Deployment Tube
(houses sonde)

Mooring line 
connection point

•  Metric Allen Wrenches: 5 mm, 6 mm, 8 mm
•  O-Ring Grease
•  Customer supplied padlock

Reviews: