18
ba15356d04
12/2021
Conditioning, calibration, measurement
CN 800
Combination
electrode CN 800
Conditioning, calibration, measurement
General
information
When operating the electrode ensure that
the filling opening (1) for the bridge electrolyte is open
the inner junctions (3) are covered with bridge electrolyte
no air bubbles are in the bridge electrolyte
the depth of immersion is within the optimum range:
Before measuring
1
Remove the storage vessel.
2
Fill the bridge electrolyte ELY/BR/503 into the filling opening.
3
Shortly press the shaft of the combination electrode against the con-
nection head to wet the ground junction with bridge electrolyte.
4
When doing so refill any spilled bridge electrolyte so that the inner
junctions are covered with bridge electrolyte.
5
Rinse the combination electrode with deionized water.
6
Wipe the shaft using a clean paper towel.
Minimum depth of im-
mersion
The ground junction (4) must be covered
Maximum depth of im-
mersion
Approx. 1 cm below the fluid level (2) of the
bridge electrolyte
1
2
3
4
1
Condition every ion sensitive electrode in standard solution before
using it.
Summary of Contents for wtw CN 800 DIN
Page 2: ...2 ba15356d04 12 2021 CN 800 Copyright 2021 Xylem Analytics Germany GmbH...
Page 6: ...6 ba15356d04 12 2021 CN 800 Copyright 2021 Xylem Analytics Germany GmbH...
Page 14: ...14 ba15356d04 12 2021 Technische Daten CN 800...
Page 15: ...OPERATING MANUAL ba15356d04 12 2021 CN 800 DIN CYANIDE SENSITIVE ELECTRODE OPERATING MANUAL...
Page 16: ...16 ba15356d04 12 2021 CN 800 Copyright 2021 Xylem Analytics Germany GmbH...
Page 24: ...24 ba15356d04 12 2021 Technical data CN 800...
Page 25: ...MODE D EMPLOI ba15356f04 12 2021 CN 800 DIN LECTRODE S LECTIVE DE CYANURE MODE D EMPLOI...
Page 26: ...26 ba15356f04 12 2021 CN 800 Copyright 2021 Xylem Analytics Germany GmbH...
Page 36: ...36 ba15356s04 12 2021 CN 800 Copyright 2021 Xylem Analytics Germany GmbH...
Page 45: ......