INSTRUCTION MANUAL
Series FS4-3T
General Purpose
Liquid Flow Switch
• Before using product, read and understand instructions.
• Save these instructions for future reference.
• All work must be performed by qualified personnel trained in the proper application,
installation, and maintenance of plumbing, steam and electrical equipment and/or systems in
accordance with all applicable codes and ordinances.
• To prevent electrical shock, turn off the electrical power before making electrical
connections.
• To prevent an electrical fire or equipment damage, electrical wiring insulation must have a
rating of 167˚F (75˚C) if the liquid’s temperature exceeds 180˚F (82˚C).
• To prevent electrocution, when the electrical power is connected to the flow switch, do not
touch the terminals.
• Make sure flow switch electrical cover is secured before turning on electric power.
Failure to follow this warning could cause property damage, personal injury or death.
California Proposition 65 warning! This product contains chemicals known to the
•
state of California to cause cancer and birth defects or other reproductive harm.
Previous controls should never be installed on a new system. Always install new
•
controls on a new boiler or system.
CAUTION:
A more frequent replacement interval may be necessary based on the condition of
the unit at time of inspection. McDonnell & Miller's warranty is one (1) year from date
of installation or two (2) years from the date of manufacture.
MM-613E
•
• Liquid m edia containing deb ris or other particulates should b e filtered to avoid dam age
to or ob struction of the flow switch paddle arm assem b ly, which could cause the flow
Switch to m alfunction.