1  Introduction and Safety

1.1  Introduction

Purpose of the manual

The purpose of this manual is to provide the necessary information for

working with the unit. Read this manual carefully before starting work.

Read and keep the manual

Save this manual for future reference, and keep it readily available at

the location of the unit.

Intended use

WARNING:

Operating, installing, or maintaining the unit in any way that

is not covered in this manual could cause death, serious per-

sonal injury, or damage to the equipment and the surround-

ings. This includes any modification to the equipment or use

of parts not provided by Xylem. If there is a question regard-

ing the intended use of the equipment, please contact a Xy-

lem representative before proceeding.

Other manuals

See also the safety requirements and information in the original manu-

facturer's manuals for any other equipment furnished separately for use

in this system.

Description of user and installer symbols

Specific information for personnel in charge of installing

the product in the system (plumbing and/or electrical

aspects) or in charge of maintenance.
Specific information for users of the product.

1.2  Safety terminology and symbols

About safety messages

It is extremely important that you read, understand, and follow the safe-

ty messages and regulations carefully before handling the product.

They are published to help prevent these hazards:

• Personal accidents and health problems

• Damage to the product and its surroundings

• Product malfunction

Hazard levels

Hazard level

Indication

DANGER:

 

A hazardous situation which, if not

avoided, will result in death or se-

rious injury

WARNING:

 

A hazardous situation which, if not

avoided, could result in death or

serious injury

CAUTION:

 

A hazardous situation which, if not

avoided, could result in minor or

moderate injury

NOTICE:

 

Notices are used when there is a

risk of equipment damage or de-

creased performance, but not per-

sonal injury.

Special symbols

Some hazard categories have specific symbols, as shown in the follow-

ing table.

 

Electrical hazard

Magnetic fields hazard

Electrical Hazard:

 

CAUTION:

 

1.3  User safety

All regulations, codes, and health and safety directives must be ob-

served.

The site

• Observe lockout/tagout procedures before starting work on the

product, such as transportation, installation, maintenance, or serv-

ice.

• Pay attention to the risks presented by gas and vapors in the work

area.

• Always be aware of the area surrounding the equipment, and any

hazards posed by the site or nearby equipment.

Qualified personnel

This product must be installed, operated, and maintained by qualified

personnel only.

Protective equipment and safety devices

• Use personal protective equipment as needed. Examples of person-

al protective equipment include, but are not limited to, hard hats,

safety goggles, protective gloves and shoes, and breathing equip-

ment.

• Make sure that all safety features on the product are functioning

and in use at all times when the unit is being operated.

1.4  Ex-approved products

Follow these special handling instructions if you have an Ex-approved

unit.

Personnel requirements

These are the personnel requirements for Ex-approved products in po-

tentially explosive atmospheres:

• All work on the product must be carried out by certified electricians

and Xylem-authorized mechanics. Special rules apply to installa-

tions in explosive atmospheres.

• All users must know about the risks of electric current and the

chemical and physical characteristics of the gas, the vapor, or both

present in hazardous areas.

• Any maintenance for Ex-approved products must conform to inter-

national and national standards (for example, IEC/EN 60079-17).

Xylem disclaims all responsibility for work done by untrained and unau-

thorized personnel.

Product and product handling requirements

These are the product and product handling requirements for Ex-ap-

proved products in potentially explosive atmospheres:

• Only use the product in accordance with the approved motor data.

• The equipment must never run dry during operation. The volute

must be filled with liquid during operation. Dry running during serv-

ice and inspection is only permitted outside the classified area.

• Before you start work on the product, make sure that the product

and the control panel are isolated from the power supply and the

control circuit, so they cannot be energized.

• Do not open the product while it is energized or in an explosive gas

atmosphere.

• Intrinsically safe circuits are normally required for the automatic lev-

el-control system by the level regulator if mounted in zone 0.

• The yield stress of fasteners must be in accordance with the appro-

val drawing and the product specification.

• Do not modify the equipment without approval from an Ex-ap-

proved Xylem representative.

• Only use original Xylem spare parts that are provided by an Ex-ap-

proved Xylem representative.

• The thermal contacts that are fitted to the stator windings must be

connected correctly to a separate motor control circuit and in use.

The thermal contacts shall be connected to a monitoring device,

which disconnects the power supply immediately upon activation.

1  Introduction and Safety

1310 Installation, Operation, and Maintenance Manual

3

Summary of Contents for GOULDS 2GFK2412H

Page 1: ...Installation Operation and Maintenance Manual 90002801_3 0 1310...

Page 2: ......

Page 3: ...2GFK3212G 2GFK3213G 2GFK3214G 2GFK3215G 2GFK3812A 2GFK3813A 2GFK3814A 2GFK3815A 3GFK3812T 3GFK3813T 3GFK3814T 2GFV3212K 2GFV3213K 2GFV3214K 2GFV3215K 2GFV3812J 2GFV3813J 2GFV3814J 2GFV3815J Pump model...

Page 4: ...8 4 2 Make the electrical connections 9 4 2 1 General precautions 9 4 2 2 Grounding earthing 9 4 2 3 Prepare the SUBCAB cables 9 4 2 4 Connect the motor cable to the pump 10 4 2 5 Connect the motor c...

Page 5: ...8 Technical Reference 19 8 1 Motor data 19 Table of Contents 2 1310 Installation Operation and Maintenance Manual...

Page 6: ...nearby equipment Qualified personnel This product must be installed operated and maintained by qualified personnel only Protective equipment and safety devices Use personal protective equipment as ne...

Page 7: ...tention Chemicals or haz ardous fluids on skin 1 Remove contaminated clothing 2 Wash the skin with soap and water for at least 1 minute 3 Seek medical attention if necessary 1 6 Protecting the environ...

Page 8: ...e pumped or mixed NOTICE Never use a naked flame to thaw the unit Unit in as delivered condition If the unit is still in the condition in which it left the factory all packing materials are undisturbe...

Page 9: ...al contact The pump is equipped with thermal contacts see Monitoring Equipment on page 6 9 Support bearing Single row ball bearing 3 3 Monitoring Equipment The following applies to the monitoring equi...

Page 10: ...ated explosion proof or intrinsically safe If the product is rated explosion proof or intrinsically safe then see the specific explosion proof information in the safety chapter before taking any fur t...

Page 11: ...nt lifting device to the pump and to the ac cess frame For example you can use a stainless steel lifting chain with shackles b Fasten the cable to the cable holder Make sure that the cable cannot be s...

Page 12: ...les These are the requirements to follow when you install cables The cables must be in good condition not have any sharp bends and not be pinched The cables must not be damaged and must not have inden...

Page 13: ...e required power supply 5 Connect the mains leads L1 L2 L3 and ground earth according to applicable cable chart The ground earth lead must be 50 mm 2 0 in longer than the phase conductors in the junct...

Page 14: ...ors and marking of main leads COLOR STANDARD STATOR LEADS BN Brown U1 U5 RD BK Black U2 U6 GN WH White V1 V5 BN OG Orange V2 V6 BU GN Green W1 W5 YE GN YE Green Yellow W2 W6 BK RD Red T1 T2 WH YE GY G...

Page 15: ...U1 Z1 T1 T2 BK BN RD YE GC 1 BN RD 2 BK BK 3 GY WH 4 T1 OG 5 T2 BU 6 WH GN YE YE Starter 1 PHASE 12 Leads 1 U1 V1 W1 U2 V2 W2 U5 V5 W5 U6 V6 W6 U1 V1 U6 U2 W2 V6 V5 W1 W5 U5 V2 W6 U1 V1 W1 W2 U2 V2 GC...

Page 16: ...essure level may exceed 70 dB A at certain operating points on the performance curve Make sure that you understand the noise level requirements in the environment where the product is installed Failur...

Page 17: ...2 If it is necessary to separate the drive unit from the hydraulic unit then do the following a Carefully open the coolant plugs to relieve any built up pressure inside the cooling jacket CAUTION Com...

Page 18: ...crews 2 Check the condition of the lifting handle and the chain 3 If necessary replace O rings 1 Replace the coolant plug O rings 2 Grease the O rings Service item Action Personnel safety de vices Che...

Page 19: ...ad of the conical sleeve with a thin layer of grease The proper lubrication is grease for bearings for example Exxon Mobil Unirex N3 Mobil Mobilith SHC 220 or equivalent NOTICE Surplus grease can caus...

Page 20: ...arance A between the impeller and the pump housing A 0 2 0 8 mm 0 008 0 032 in 10 Check that the impeller can rotate freely WARNING Crush Hazard Beware of the pinch point hazard between the rotating i...

Page 21: ...distance between the start and stop levels is sufficient The non return valve s work s properly The length of the discharge pipe between the pump and the first non return valve is sufficiently short T...

Page 22: ...otate by hand Clean the impeller Clean out the sump Check that the impeller is properly trim med The pipes are ob structed To ensure a free flow clean out the pipes The pipes and joints leak Find the...

Page 23: ......

Page 24: ...ced analytics solutions for water electric and gas utilities In more than 150 countries we have strong long standing relationships with customers who know us for our powerful combination of leading pr...

Reviews: