4. Attach the permanent lifting device to the sump structure.
5. Secure the motor cable.
Make sure that the cable cannot be sucked into the pump inlet and that it is not sharply
bent or pinched.
6. Connect the motor cable according to the separate instructions.
Clean all the debris from the sump before the pump is started.
5.3.3 Install the pump: S-installation
WS009899A
S Portable semipermanent, wet well arrangement with hose coupling or flange for
connection to the discharge pipeline.
1. Install the discharge connection on the pump.
For more information, see the separate accessories documentation.
WS009897A
2. Attach a permanent lifting device to the pump. For example, use a stainless steel lifting
chain with shackles.
3. Make sure that the sump bottom is aligned horizontally.
4. Put the pump in position on the sump bottom. Use a stand between the pump and the
sump bottom.
5 Mechanical Installation
22
Concertor
™
6020 Installation, Operation, and Maintenance Manual
Summary of Contents for Flygt Concertor 6020
Page 1: ...Installation Operation and Maintenance Manual Concertor 6020 ...
Page 2: ......
Page 53: ......
Page 54: ......
Page 55: ......