VESDA Pipe Network Design Guide
VESDA by Xtralis
42
www.xtralis.com
9.2
Maximum Transport Time
Maximum transport time indicates the longest time taken for smoke to travel from a sampling hole to the
detector. You should aim to get the lowest possible time without compromising on the Hole % Balance and
the Hole % Share values.
Note:
Subject to local codes and standards the maximum transport time is 120 seconds. We recommend
the maximum transport time of less than 60 seconds when early warning is desired.
Pipe lengths affect the time to transport a sample of air from the collection point to the detector. Factors like
bends, diameter of sampling holes and endcap holes also affect the transport time. Figure 10-1 on page 43
illustrates how the same area can be covered by different pipe lengths.
9.3
Hole Sensitivity
The relative sample hole sensitivity is a measure of the sample hole in relation to the detector’s fire threshold
sensitivity. Mathematically it is presented as:
Detector Sensitivity / (Sample hole flow / Sum of all sample point flows) = % obs/m (%obs/ft)
= 2.0% Obs/m
Detector Sensitivity
Sample Hole Flow / Sum of all Sample Point Flows
0.1
0.05
=
Figure 9-2: Hole sensitivity
Summary of Contents for VESDA VLC-505
Page 1: ...VESDA Student Workbook Rev 8a 15SEP21 ...
Page 4: ...iv ...
Page 14: ...VESDA Course Overview 1 10 VESDA Student Workbook Create Xtralis Account ...
Page 20: ...VESDA Course Overview 1 16 VESDA Student Workbook ...
Page 23: ...VESDA Products VESDA Student Workbook 2 3 ASD iVESDA ASD ...
Page 24: ...VESDA Products 2 4 VESDA Student Workbook VESDA model comparison chart ...
Page 32: ...VESDA Products 2 12 VESDA Student Workbook Industrial facilities Industrial facilities ...
Page 33: ...VESDA Products VESDA Student Workbook 2 13 Solutions for all environments Detectors ...
Page 56: ...Installation 3 4 VESDA Student Workbook IDP Installation Practices ...
Page 68: ...Installation 3 16 VESDA Student Workbook ...
Page 74: ...VESDAnet Connection 4 6 VESDA Student Workbook ...
Page 218: ...VSC Software Installation A 4 VESDA Student Workbook ...
Page 224: ...ASPIRE Software Installation B 6 VESDA Student Workbook ...
Page 238: ...14 ...
Page 239: ...VESDA Pipe Network Design Guide February 2019 Document 10193_09 Part Number 30009 ...
Page 240: ......
Page 293: ...VESDA Pipe Network Installation Guide March 2019 Document 10255_08 Part Number 30008 ...
Page 294: ......
Page 333: ......
Page 334: ...VESDA Commissioning Guide December 2012 Document 10195_06 Part Number 30005 ...
Page 335: ......