RFA Footsies are directional. Choose the drive side RFA
Footsie first. The mounting plate faces the front of the bike.
Remove the upper clamp assembly from drive side
RFA Footsie.
Align bolt positions on RFA Footsie with threaded holes
on RFA frame. Route the derailleur cables behind the
RFA Footsie front mounting plate. Do not pinch cables.
Loosely thread the front two M8 bolts.
1
2
3
4
Loosen the four bolts that attach the Utility Rack to the
RFA frame prior to starting.
Installing RFA Footsies
RFA Footsies
Installation Manual
Included
Drive side RFA Footsie
Non-drive side RFA Footsie
4 M8 bolts
4 M6 bolts
4 Rubber pads (using them is optional)
Tools needed
6mm allen key
4mm allen key
Note: Utility Rack must be installed on the frame before attaching RFA Footsies.