
VB3/V5/VB5 series inverter
20
Fig
Fig
Fig
Fig 2
2
2
2
-
4
4
4
4
(
b
b
b
b
)
control
control
control
control panel
panel
panel
panel jumper
jumper
jumper
jumper position
position
position
position
1.5~3.7KW
VB5 series three phase inverter jumper position
Fig
Fig
Fig
Fig 2
2
2
2
-
4
4
4
4
(
cccc
)
control
control
control
control panel
panel
panel
panel jumper
jumper
jumper
jumper position
position
position
position
5.5~7.5KW
VB5 series three phase inverter jumper position
Fig
Fig
Fig
Fig 2
2
2
2
-
4
4
4
4
(
d
d
d
d
)
control
control
control
control panel
panel
panel
panel jumper
jumper
jumper
jumper position
position
position
position
11~55KW
V5 series inverter jumper position
Fig
Fig
Fig
Fig 2
2
2
2
-
4
4
4
4
(
eeee
)
control
control
control
control panel
panel
panel
panel jumper
jumper
jumper
jumper position
position
position
position
The position of terminals and jumpers on control panel are shown in Fig. 2-4, the function descriptions of terminals are shown in
Table 2-3 and the function descriptions of jumpers and their setting method are shown in Table2-2. Before running the inverter,
make sure terminals wiring and jumpers setting have been done, more than 1mm
2
cables are recommended to use.
Table
Table
Table
Table 2-2
2-2
2-2
2-2 Function
Function
Function
Function of
of
of
of jumpers
jumpers
jumpers
jumpers
Jumper
Function
Setup
Default Setup
JP1
Pulse output terminal
DO power selection
1
-
2 connect
:
External power supply
2
-
3 connect
:
Inverter’s internal
24V power supply
External power supply
Summary of Contents for VB3-20P7
Page 59: ...V5 series inverter 53 ...