30
ML628 IBERT Getting Started Guide
UG806 (v1.0) May 20, 2011
Running the GTX IBERT Demonstration
2.
Place the main power switch SW1 in the off position.
More Information
Additional information on the ChipScope Pro software and GTH IBERT core can be found
in:
•
www.xilinx.com/support/documentation/sw_manuals/xilinx13_1/
chipscope_pro_sw_cores_ug029.pdf
, UG029 -
ChipScope Pro Software Cores
•
http://www.xilinx.com/support/documentation/ip_documentation/
chipscope_ibert_virtex6_gtx.pdf
, DS732 -
ChipScope Integrated Bit Error Ratio Test
(IBERT) for Virtex-6 GTX
.