XIA LLC
UltraLo‐1800 Alpha
Particle Counter
Site Requirements & Planning
Version:
0.4
Friday,
February
15,
2013
Page 1: ...XIA LLC UltraLo 1800 Alpha Particle Counter Site Requirements Planning Version 0 4 Friday February 15 2013...
Page 2: ...equirements 6 4 Required clearances 7 5 Mounting hole locations 8 6 Dimensions and weights 9 7 Electrical requirements 10 D Prepare for installation 11 1 Safety and materials 11 E Receiving and inspec...
Page 3: ...their procedures and uses of the instrument B Installation Overview Before the system arrives at your location please prepare your site for the installation process according to the instructions that...
Page 4: ...st be within 6 feet 1 8m of counter Req d Clearance 46 0 117 cm Gas Inlet 24 0 61 cm 1 8 4 6 cm Gas Inlet 50 0 127 cm 26 0 66 cm Figure 1 Space Requirements For details on space requirements see Dimen...
Page 5: ...ate of installation the gas tubing must be run from the gas source to the site of installation and terminate at the specified gas inlet location The termination of the metal tube at the gas inlet loca...
Page 6: ...oot traffic and away from acoustically noisy machinery such as fans pumps etc Verify that the installation location Is not adjacent to vibration sources such as pumps compressors or fans Excessive vib...
Page 7: ...m forward from the instrument s front face See Figure 3 below for illustration When loading or removing a sample the user may wish to stand to either side of the extended tray or alternatively in fron...
Page 8: ...ise the mounting hole pattern is provided below The vibration isolating feet are symmetrically located underneath the counter body 20 size hardware would be appropriate Mounting hardware is not suppli...
Page 9: ...left side to the right side of the object and Depth is defined as the distance from the front to the back of the object Component Width in Depth in Height in Weight lbs Counter Module closed 34 3 87...
Page 10: ...its powering electrically noisy systems or devices that can cause power surges such as vacuum pumps stepper motors ovens refrigeration units etc If you wish to install and use an uninterruptible power...
Page 11: ...ppropriate precautions are not followed The customer is responsible for compliance with any safety requirements that pertain to the installation of the gas supply lines b Materials for installation ma...
Page 12: ...cuments 3 Shipping container dimensions All items will arrive in one large shipping container crate The dimensions for the crate are listed in the table below Crate Dimension Minimum building clearanc...
Page 13: ...es Location accommodates the dimensions and weights specified in Dimensions and weights on pg 9 Location meets the requirements specified in Space requirements on pg 3 B Gas checklist Date verified Re...
Page 14: ...red building clearances can accommodate the dolly and main instrument body dimensions See Shipping container dimensions pg 12 Received the system and inspected the shipping containers for mishandling...