08/2012
6-12
WorkCentre 5021/5019
6.1.11, 6.1.12
Initial Issue
General Procedures
6.1.11.2 Audible Noise
Audible noise level of the product shall be the following values or below (when 60Hz M/C is
available, it shall be used for the assessment.):Noise shall be measured according to C11-707.
•
*1: Base Configuration: Platen Cover + IIT + IOT
•
*2: Full System Configuaration: DADF + IIT + IOT + STM
•
*3: LwAd: Sound power level at a source. = measured value LwA (1 M/C) + 0.3B
•
*4: LpAm: Sound pressure level at a bystander position
6.1.12 Installation Environment
This machine can be operated under the following conditions:
•
Temperature: 10 degrees C to 32 degrees C
•
Humidity: 15 to 85% (with no condensation)
•
Altitute: 0 to 8,200 feet (0 to 2,500 meters)
Table 4
Item
18 CPM
20 CPM
Base
Config *1
Full
System *2
Base
Config *1
Full
System *2
Declared A-weighted sound power level
at standby *3 (unit: B)
4.30
4.30
4.30
4.30
Delcared A-weighted sound power level
at running *3 (unit: B)
6.53
7.10
6.60
7.17
Sound pressure level at running *4 (unit:
dB) (reference only)
49
52
49
52
Summary of Contents for WorkCentre 5019
Page 17: ...08 2012 2 6 WorkCentre 5021 5019 2 1 3 Initial Issue Status Indicator RAPs ...
Page 19: ...08 2012 2 8 WorkCentre 5021 5019 2 2 1 1 Initial Issue Status Indicator RAPs ...
Page 21: ...08 2012 2 10 WorkCentre 5021 5019 003 500 795 003 951 Initial Issue Status Indicator RAPs ...
Page 23: ...08 2012 2 12 WorkCentre 5021 5019 004 345 Initial Issue Status Indicator RAPs ...
Page 33: ...08 2012 2 22 WorkCentre 5021 5019 023 600 Initial Issue Status Indicator RAPs ...
Page 37: ...08 2012 2 26 WorkCentre 5021 5019 041 210 211 Initial Issue Status Indicator RAPs ...
Page 39: ...08 2012 2 28 WorkCentre 5021 5019 042 325 614 Initial Issue Status Indicator RAPs ...
Page 41: ...08 2012 2 30 WorkCentre 5021 5019 045 310 045 313 Initial Issue Status Indicator RAPs ...
Page 43: ...08 2012 2 32 WorkCentre 5021 5019 061 321 061 325 Initial Issue Status Indicator RAPs ...
Page 47: ...08 2012 2 36 WorkCentre 5021 5019 071 105 Initial Issue Status Indicator RAPs ...
Page 51: ...08 2012 2 40 WorkCentre 5021 5019 075 135 Initial Issue Status Indicator RAPs ...
Page 57: ...08 2012 2 46 WorkCentre 5021 5019 092 660 668 092 910 Initial Issue Status Indicator RAPs ...
Page 59: ...08 2012 2 48 WorkCentre 5021 5019 093 312 093 912 Initial Issue Status Indicator RAPs ...
Page 61: ...08 2012 2 50 WorkCentre 5021 5019 095 910 Initial Issue Status Indicator RAPs ...
Page 63: ...08 2012 2 52 WorkCentre 5021 5019 116 321 116 377 Initial Issue Status Indicator RAPs ...
Page 65: ...08 2012 2 54 WorkCentre 5021 5019 117 326 Initial Issue Status Indicator RAPs ...
Page 67: ...08 2012 2 56 WorkCentre 5021 5019 123 314 Initial Issue Status Indicator RAPs ...
Page 75: ...08 2012 2 64 WorkCentre 5021 5019 2 2 4 8 Initial Issue Status Indicator RAPs ...
Page 89: ...08 2012 3 14 WorkCentre 5021 5019 IQ15 Initial Issue Image Quality ...
Page 106: ...08 2012 4 4 WorkCentre 5021 5019 4 1 Initial Issue Disassembly Assembly and Adjustment ...
Page 116: ...08 2012 4 14 WorkCentre 5021 5019 REP 1 6 1 Initial Issue Repairs and Adjustments ...
Page 118: ...08 2012 4 16 WorkCentre 5021 5019 REP 2 1 1 Initial Issue Repairs and Adjustments ...
Page 122: ...08 2012 4 20 WorkCentre 5021 5019 REP 4 1 1 Initial Issue Repairs and Adjustments ...
Page 124: ...08 2012 4 22 WorkCentre 5021 5019 REP 6 1 1 Initial Issue Repairs and Adjustments ...
Page 126: ...08 2012 4 24 WorkCentre 5021 5019 REP 7 1 1 Initial Issue Repairs and Adjustments ...
Page 130: ...08 2012 4 28 WorkCentre 5021 5019 REP 8 2 1 REP 8 2 2 Initial Issue Repairs and Adjustments ...
Page 162: ...08 2012 4 60 WorkCentre 5021 5019 REP 19 2 1 Initial Issue Repairs and Adjustments ...
Page 190: ...08 2012 4 88 WorkCentre 5021 5019 ADJ 1 3 2 Initial Issue Repairs and Adjustments ...
Page 192: ...08 2012 4 90 WorkCentre 5021 5019 ADJ 8 1 1 Initial Issue Repairs and Adjustments ...
Page 198: ...08 2012 4 96 WorkCentre 5021 5019 ADJ 18 2 2 Initial Issue Repairs and Adjustments ...
Page 209: ...08 2012 5 6 WorkCentre 5021 5019 5 1 4 5 1 5 Initial Issue Parts List ...
Page 267: ...08 2012 5 64 WorkCentre 5021 5019 99 8 Initial Issue Parts List ...
Page 293: ...08 2012 6 24 WorkCentre 5021 5019 6 1 28 6 1 29 Initial Issue General Procedures ...
Page 295: ...08 2012 6 26 WorkCentre 5021 5019 6 2 1 6 2 2 Initial Issue General Procedures ...
Page 299: ...08 2012 6 30 WorkCentre 5021 5019 6 3 1 3 Initial Issue General Procedures ...
Page 303: ...08 2012 6 34 WorkCentre 5021 5019 6 3 2 3 Initial Issue General Procedures ...
Page 305: ...08 2012 6 36 WorkCentre 5021 5019 6 3 3 Initial Issue General Procedures ...
Page 317: ...08 2012 6 48 WorkCentre 5021 5019 6 3 6 Initial Issue General Procedures ...
Page 319: ...08 2012 6 50 WorkCentre 5021 5019 6 3 7 Initial Issue General Procedures ...
Page 325: ...08 2012 6 56 WorkCentre 5021 5019 6 3 10 Initial Issue General Procedures ...
Page 327: ...08 2012 6 58 WorkCentre 5021 5019 6 3 11 Initial Issue General Procedures ...
Page 331: ...08 2012 6 62 WorkCentre 5021 5019 6 3 13 Initial Issue General Procedures ...
Page 335: ...08 2012 6 66 WorkCentre 5021 5019 6 3 14 Initial Issue General Procedures ...
Page 337: ...08 2012 6 68 WorkCentre 5021 5019 6 3 15 Initial Issue General Procedures ...
Page 347: ...08 2012 6 78 WorkCentre 5021 5019 6 3 17 Initial Issue General Procedures ...
Page 353: ...08 2012 6 84 WorkCentre 5021 5019 6 3 19 Initial Issue General Procedures ...
Page 355: ...08 2012 6 86 WorkCentre 5021 5019 6 3 20 Initial Issue General Procedures ...
Page 358: ...08 2012 6 89 WorkCentre 5021 5019 6 4 1 3 General Procedures Initial Issue ...
Page 359: ...08 2012 6 90 WorkCentre 5021 5019 6 4 1 3 Initial Issue General Procedures ...
Page 377: ...08 2012 6 108 WorkCentre 5021 5019 6 4 3 Initial Issue General Procedures ...
Page 393: ...08 2012 7 10 WorkCentre 5021 5019 7 1 2 Initial Issue Wiring Data ...
Page 415: ...08 2012 7 32 WorkCentre 5021 5019 4 5 Initial Issue Wiring Data ...
Page 423: ...08 2012 7 40 WorkCentre 5021 5019 CH2 1 Initial Issue Wiring Data ...
Page 427: ...08 2012 7 44 WorkCentre 5021 5019 CH3 3 Initial Issue Wiring Data ...
Page 429: ...08 2012 7 46 WorkCentre 5021 5019 CH4 1 Initial Issue Wiring Data ...
Page 437: ...08 2012 7 54 WorkCentre 5021 5019 CH5 7 Initial Issue Wiring Data ...