AUSTRALIA HONG KONG MALAYSIA NEW ZEALAND SINGAPORE UAE UNITED KINGDOM UNITED STATES
1.
Trough
2.
Paver or Concrete
3.
Leveling material
4.
Brackets for leveling
5.
Power feed inlet
1
2
3
4
5
6
XTI 5.0 | INGROUND UPLIGHT CASE
1
Identify contents
Instruction
Sheet
If more information is required please contact your local representative by going to
xerolighting.com/contacts
or email us at
INSTALLATION INSTRUCTION
2
2
2
2
Install case in suitable location making sure it is level
Maintain width of opening with supplied disposable
brackets - (Make sure the protective film is not removed
until luminaire installation takes place)
2
3
4
25
26
Ensure that the case is installed into a free draining
location with drainage material underneath
Install power feed cables - making sure that the
connections point is in an enclosure
Pave or finish groundworks
For installation of the
XTI | 5.0 Inground Uplight IP67 IK10+
please turn over page
locate the correct
case for each luminaire
22
7
Trough
Bracket pre-
attached to trough
disposable brackets
protective film
TOP VIEW
1
2
3
4
6.
Drainage material
5
6
7.
Drainage hole
7
Perform a drainage
test once case is
installed to ensure that water free drains.
Luminaire must not be immersed in water for more than 30 minutes