
Prosine 2.5/3.0 Installation & Operation Guide
21
Section 2: Controls and Indicators
Power Indicator
A green LED labeled “
UTILITY/SHOREPOWER (INCOMING)
”
lights
whenever AC power is supplied to the AC INPUT connectors on the
inverter/charger. Throughout this manual, the term “shorepower” refers to
the presence of AC power at the AC INPUT connectors, regardless of the
source of the power: from the utility grid (power company), a generator,
or any other source.
Charger Status Indicator and On/Off Button
The Charger Status Display includes four LEDs:
a green LED labeled CHARGE; a green LED
labeled READY; an amber LED labeled
STANDBY; and an amber LED labeled
EQUALIZE. A charger On/Off button is also
provided.
Charge LED
The green CHARGE LED lights when the Prosine charger is in Bulk or Absorption
charging mode. A discussion of the Prosine multi-stage charging profile is found in
Ready LED.
The green READY LED lights when the charging regime has been completed, and the
charger is in Float charging mode.
Standby LED.
The amber “STANDBY” LED lights when the charger is enabled awaiting AC
power. When shorepower becomes available, the charger will begin charging, the Standby LED will
be extinguished, and the Charge LED will be lighted.
Equalize LED
The amber “
EQUALIZE
” LED lights when the battery equalization has been
requested, and the Prosine is in Charge mode. An equalization charge cycle will commence after fully
charging the batteries, and both the
EQUALIZE
LED and the
CHARGE
LED will flash on-and-off.
See
“Section 6: Multistage Charging”
for more information about equalization.
On/Off Button
The charger
ON/OFF
button switches the charger between charger standby mode,
On, and Off. In standby mode, the charger begins charging automatically when AC shorepower is
available. In charge mode, press and hold this button for 5 seconds to request an equalize charge.
Equalize mode will not begin until the batteries are fully charged.
CAUTION
Disconnect DC loads on the batteries during equalization to prevent damage to them by
the high voltages encountered during equalization. Equalization must be monitored to prevent battery
damage. Refer to
“Section 6: Multistage Charging”
for more details.
Summary of Contents for Prosine PS2.5 and
Page 1: ...Xantrex ProsineTM 2 5 and 3 0 Inverter Chargers Installation and Operation Guide PS2 5 PS3 0...
Page 2: ...ProsineTM PS2 5 Inverter Charger PS3 0 Inverter Charger Installation and Operation Guide...
Page 9: ...vi Prosine 2 5 3 0 Installation Operation Guide Figure 1 Inverter Charger Components...
Page 13: ...Return Procedure x Prosine 2 5 3 0 Installation Operation Guide...
Page 21: ...Inverter Features 4 Prosine 2 5 3 0 Installation Operation Guide...
Page 41: ...Battery Temperature Sensor 24 Prosine 2 5 3 0 Installation Operation Guide...
Page 75: ...Operating Limits for Inverter Operation 58 Prosine 2 5 3 0 Installation Operation Guide...
Page 83: ...Operating Limits for Charger Operation 66 Prosine 2 5 3 0 Installation Operation Guide...
Page 95: ...Cabling Hook up Configurations 78 Prosine 2 5 3 0 Installation Operation Guide...
Page 101: ...84 Prosine 2 5 3 0 Installation Operation Guide...
Page 111: ...Error Code Table 94 Prosine 2 5 3 0 Installation Operation Guide...