background image

58.7mm

5⁄16

"

77.7mm

3 1⁄16"

101.6mm

4"

99mm

29⁄32

"

BASO 4.0 GRID TYPES

BASO 2.5 GRID TYPES

BASO 1.5 GRID TYPES

9⁄16 T-GRID

15⁄16 T-GRID

9⁄16 SLOT GRID

9⁄16 SLOT GRID

9⁄16 T-GRID

15⁄16 T-GRID

9⁄16 SLOT GRID

9⁄16 SLOT GRID

9⁄16 T-GRID

15⁄16 T-GRID

9⁄16 SLOT GRID

9⁄16 SLOT GRID

68.3mm

11⁄16

"

58.7mm

5⁄16

"

58.7mm

5⁄16

"

77.7mm

3 1⁄16"

77.7mm

3 1⁄16"

77.7mm

3 1⁄16"

99mm

29⁄3

2

"

99mm

29⁄3

2

"

76.2mm

3"

99mm

3 29⁄32"

85.7mm

3⁄8

"

76.2mm

3"

76.2mm

3"

111.1mm

4 3∕8"

101.6mm

4"

101.6mm

4"

99mm

3 29⁄32

"

99mm

3 29⁄32

"

99mm

3 29⁄32"

99mm

29⁄3

2

"

1. Remove surrounding tiles from ceiling

2. Remove inset and cover from channel

3. Slide bracket(s) on top of channel 

5A. Use screw(s) to secure side 

       bracket(s) (9⁄16 SLOT GRID ONLY)

7. Confirm that channel is sitting in 

    grid properly 

4. Use screw(s) to secure bracket(s)

5B. Use screw(s) to secure side bracket(s)  

      (9⁄16 T-GRID and 15⁄16 T-GRID ONLY)

6. Drop channel(s) into grid ceiling

Turn OFF power source before 

installation

10. Bring channels together via connector

8. Secure channel bracket(s) with cable(s) 9. Make primary connections via flex 

    conduit (supplied by others)

13. Insert inset(s) and covers to complete 

     the installation

11. Use screws to secure connector. For 

     continuous runs, follow steps 10 - 12

12. Make connection between segments 

     (continuous runs: follow steps 10 - 12) 

*insert screw through 

BOTTOM

 

HOLE

*

*insert screw through 

TOP HOLE

*

MI-V01

4/20/21

XAL Inc.   150 Hawley Rd.   Oxford, CT 06478   T: +1 203.262.9990   www.xalusa.com

2

MOUNTING INSTRUCTIONS

BASO  1.5 

/

 2.5 

/

 4.0     

GRID

Summary of Contents for BASO 1.5

Page 1: ...not included POWER OFF POWER ON DON T TOUCH THE LED pencil drill screws screwdriver ATTENTION USE ESD GLOVES L 72 1828 8mm feeder position 2 50 8mm L 96 2438 4mm feeder position 2 50 8mm L 48 1219 2mm feeder position 2 50 8mm MI V01 4 20 21 XAL Inc 150 Hawley Rd Oxford CT 06478 T 1 203 262 9990 www xalusa com 1 MOUNTING INSTRUCTIONS BASO 1 5 2 5 4 0 GRID Please see next pages for trim and trimless...

Page 2: ...m 3 1 16 99mm 3 29 32 99mm 3 29 32 76 2mm 3 99mm 3 29 32 85 7mm 3 3 8 76 2mm 3 76 2mm 3 111 1mm 4 3 8 101 6mm 4 101 6mm 4 99mm 3 29 32 99mm 3 29 32 99mm 3 29 32 99mm 3 29 32 1 Remove surrounding tiles from ceiling 2 Remove inset and cover from channel 3 Slide bracket s on top of channel 5A Use screw s to secure side bracket s 9 16 SLOT GRID ONLY 4 Use screw s to secure bracket s Turn OFF power sou...

Page 3: ...id ceiling 8 Secure channel bracket s with cable s 9 Make primary connections via flex conduit supplied by others 14 Insert inset s and covers to complete the installation 13 Make connection between segments continuous runs follow steps 9 13 insert screw through BOTTOM HOLE insert screw through TOP HOLE 10 Slide connectors into channels 11 SYSTEMS Use screws to secure connectors to channels tab sh...

Page 4: ... 13 16 Cutout 91 5mm 3 5 8 SIGN LEGEND POWER OFF POWER ON DO NOT TOUCH THE LED ATTENTION USE ESD GLOVES REQUIRED TOOLS not included ENDCAP WIDTH 3 32 2 4mm ENDCAP WIDTH 3 32 2 4mm FEEDER POSITION 2 50 8mm FEEDER POSITION 2 50 8mm FEEDER POSITION 2 50 8mm 74 7mm 2 15 16 pencil drill screws screwdriver spackle knife drywall saw MI V01 4 20 21 XAL Inc 150 Hawley Rd Oxford CT 06478 T 1 203 262 9990 ww...

Page 5: ...rom channel cutout dimension above 5 Use spacer block to maintain channel width 9 Make primary connections via flex conduit supplied by others 10 Slide connectors into channels 11 SYSTEMS Use screws to secure connectors to channels tab should not be past end of the channel 12 SYSTEMS Slide channels together Secure connectors with screw and nut 13 SYSTEMS Establish connection between segments conti...

Page 6: ...ide channel while screwing channel to block BASO 1 5 Turn spacer block flat and insert into the channel Leave spacer inside channel while screwing channel to block BASO 2 5 Turn measuring block sideways and insert into the channel Leave spacer inside channel while screwing channel to block BASO 4 0 Spacer Block MI V01 4 20 21 XAL Inc 150 Hawley Rd Oxford CT 06478 T 1 203 262 9990 www xalusa com 6 ...

Page 7: ...2 2 4mm ENDCAP WIDTH 3 32 2 4mm FEEDER POSITION 2 50 8mm FEEDER POSITION 2 50 8mm FEEDER POSITION 2 50 8mm BASO 1 5 DIRECT TRIM BASO 2 5 DIRECT TRIM BASO 4 DIRECT TRIM Cutout 91 5mm 3 5 8 Cutout 67 2mm 2 5 8 SIGN LEGEND TOOLS REQUIRED not included POWER OFF POWER ON DON T TOUCH THE LED PENCIL DRILL SCREWS SCREWDRIVER SPACKLE KNIFE DRY WALL SAW ATTENTION USE ESD GLOVES MI V01 4 20 21 XAL Inc 150 Ha...

Page 8: ...le fabricant ou un tiers habilité Il faut que le circuit de LED soit fermé avant de connecter le convertisseur XAL ne assume pas la garantie si cette norme ne se respecte pas ES La instalación la puesta en marcha y el mantenimiento sólo deben realizarse por personal especializado considerando esta guía de instalación y todas las normas y reglamentaciones vigentes Asegurarse de la aptitud eléctrica...

Page 9: ...ité Il faut que le circuit de LED soit fermé avant de connecter le convertisseur XAL ne assume pas la garantie si cette norme ne se respecte pas ES La instalación la puesta en marcha y el mantenimiento sólo deben realizarse por personal especializado considerando esta guía de instalación y todas las normas y reglamentaciones vigentes Asegurarse de la aptitud eléctrica mecá en esta p ej Limpieza Es...

Reviews: