WC-R4100-60-DBL
INSTALLATION
Prior to installation please check received
items against the "Packing List".
Please report any missing items to your
retailer immediately.
Professional installation recommended.
Protect all surfaces from sharp objects,
high heat sources,direct prolonged
sunlight and chemical hazards.
PACKING LIST
1
12
2
4
4
2
1
Vanity/Counter/Sinks
Electric drill
Silicone
Tape measure
Drill bit (
Pencil
Screwdriver
)
INSTALLATION INSTRUCTIONS
Φ8
Insert the anchor into the screw hole
for reinforcement.
1
12
2
X
Diameter 8mm
Depth 40mm
Mark screw position
Draw horizontal line
PACKING LIST
REQUIRED TOOLS NOT IN BOX
Mark the position of the screw holes on the wall by measuring the space
between the centers of the mounting brackets on the back of the vanity.
Vertical position (X) is decided by the purchaser. Remember to mark low
enough to accommodate the sink on the top of the vanity counter or it
will be too high when installed. Use a spirit level to ensure the screw
holes are horizontal.
12
12
4