background image

WC-R4100-30-VESSEL

INSTALLATION

Prior to installation please check received

items against the "Packing List".

Please report any missing items to your
retailer immediately.

Professional installation recommended.

Protect all surfaces from sharp objects,
high heat sources,direct prolonged

sunlight and chemical hazards.

PACKING LIST

6

2

1

Vanity/Counter/Sink 

Electric drill

Silicone

Tape measure

Drill bit (

Pencil

Screwdriver

)

INSTALLATION INSTRUCTIONS

Φ8

Insert the anchor into the screw hole 
for reinforcement.

2

6

6

6

2

 

X

Diameter 8mm

Depth 40mm

Mark screw position

Draw horizontal line

PACKING LIST

REQUIRED TOOLS NOT IN BOX

Mark the position of the screw holes on the wall by measuring the space 
between the centers of the mounting brackets on the back of the vanity.
Vertical position (X) is decided by the purchaser. Remember to mark low 
enough to accommodate the sink on the top of the vanity counter or it 
will be too high when installed. Use a spirit level to ensure the screw 
holes are horizontal.

Reviews: