Commissioning
Multi 9420
12
ba75964e04
04/2015
3
Commissioning
3.1
Scope of delivery
MeterMulti 9420
USB cable (A plug on mini B plug)
Power pack
Stand with stand base
Short instructions
Detailed operating manual (4 languages)
CD-ROM
3.2
Power supply
The Multi 9420 is supplied with power in the following ways:
Mains operation with the supplied power pack
Operation of the system clock with a buffer battery if there is no mains power
supply (see section 12.1.2 E
3.3
Initial commissioning
Perform the following activities:
Connect the power pack
(see section 3.3.1 C
Switch on the meter
(see section 3.5 S
Set the date and time
(see section 3.8.5 E
Mount the stand
(see operating manual of the stand)