OPERATING MANUAL
ba64106e03 03/2018
MIQ/JBR
IQ S
ENSOR
N
ET
SIGNAL AMPLIFIER MODULE
Po
we
r
!
OK
Page 1: ...OPERATING MANUAL ba64106e03 03 2018 MIQ JBR IQ SENSOR NET SIGNAL AMPLIFIER MODULE Power OK...
Page 2: ...MIQ JBR 2 ba64106d03 03 2018 Copyright 2017 Xylem Analytics Germany GmbH Printed in Germany...
Page 3: ...signs on the product 6 2 1 3 Further documents providing safety information 6 2 2 Safe operation 7 2 2 1 Authorized use 7 2 2 2 Requirements for safe operation 7 2 2 3 Unauthorized use 7 2 3 User qua...
Page 4: ...has a modular structure like the IQ SENSOR NET system itself It consists of a system operating manual and the operating manuals of all the components used Please file these component operating manuals...
Page 5: ...on B The MIQ JBR signal amplifier module has an integrated bi directional signal amplifier to amplify data signals during the transition between the signal ranges SENSORNET connections for the signal...
Page 6: ...ds might be damaged if the actions mentioned are not taken 2 1 2 Safety signs on the product Note all labels information signs and safety symbols on the product A warning symbol triangle without text...
Page 7: ...itly described in this operating manual example connecting electrical lines to the terminal strip 2 2 3 Unauthorized use The product must not be put into operation if it is visibly damaged e g after b...
Page 8: ...anically and electrically in the system stacked mounting distributed mounting etc The various types of installation are described in detail in the INSTALLATION chapter of the system operating manual 3...
Page 9: ...to the length required for the installation Always fit all the ends of the wires with wire end sleeves before connecting them to the terminal strip Any wires that are not used and project into the enc...
Page 10: ...m Determine the number of MIQ power supply modules required for the system following the rules for the optimum power supply see system operating manual Signal amplification To amplify the signal the M...
Page 11: ...ithin a signal range the same rules apply as for systems without MIQ JBR see chapter INSTALLATION of the IQ SENSOR NET system operating manual The longest cable section of each signal range is determi...
Page 12: ...JBR A B x x x MIQ module with SN terminator switch On MIQ module with SN terminator switch Off longest cable section of a signal range The proceeding to determine the longest cable section can be foun...
Page 13: ...4 1 Maintenance The MIQ JBR requires no special maintenance The general maintenance of IQ SENSOR NET components is described in the IQ SENSOR NET system operating manual 4 2 Cleaning The cleaning of I...
Page 14: ...Dimensions Fig 5 1 Dimension drawing of MIQ module dimensions in mm Mechanical structure 100 148 144 0 115 0 70 0 144 0 45 0 72 0 52 2 11 0 16 5 Side view Front view Rear view Stack mounting Maximum n...
Page 15: ...C 65 C 13 149 F Relative humidity Mounting installation maintenance 80 Yearly average 90 Dew formation Possible Site altitude Max 2000 m above sea level Applicable norms EN 61010 1 UL 61010 1 CAN CSA...
Page 16: ...SOR NET system operating manual Power consumption approx 0 2 W Protective class III IQ SENSOR NET connections 4 2 additional switchable SENSORNET terminators terminating resistors Terminal type Screw...
Page 17: ......
Page 18: ...buildings factories and farms In more than 150 countries we have strong long standing relationships with customers who know us for our powerful combination of leading product brands and applications...