
System 2020 XT C
ONNECT
Installation
3 - 43
ba75970e01
10/2012
3.10.3 Checking the voltage supply
This test should always be performed:
after the initial commissioning
after any system extension or modification.
This test checks the power supply and the communication of the com
-
ponents after the system has been started.
Test procedure
1
Check the status of the LEDs on the MIQ power supply mod
-
ules (Fig. 3-31):
– Yellow lights upOperational voltage OK.
The operational voltage supplied is
constant and is max. 24 V.
– Red lights upOperational voltage with power limitation.
The operational voltage supplied is
adjusted to the load conditions.
– no LED lights up:Operational voltage too low.
The operational voltage supplied is
too low or the MIQ power supply
module is defective.
2
Dock any existing MIQ/TC 2020 XT mobile terminals on the
system as far away as possible from a MIQ power supply mod
-
ule (i.e. test of the power supply in the most unfavorable pos
-
sible conditions)
3
Check the status of the LEDs on all MIQ modules (except for
the MIQ power supply modules, see step 1) (Fig. 3-31):
– Yellow lights upOperational voltage OK
– Red lights upOperational voltage in warning range. The
component is fully functional. How
-
ever, any further slight drop in volt
-
age can lead to failure
– no LED lights up:Operational voltage in error range
The relationship between the supply voltage, the LED sta
-
tus and the log book entries is described in the section
Summary of Contents for IQ SENSOR NET System 2020 XT
Page 2: ...Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Page 8: ...Contents System 2020 XT CONNECT 0 6 ba75970e01 10 2012...
Page 24: ...Overview System 2020 XT CONNECT 1 16 ba75970e01 10 2012...
Page 28: ...Safety System 2020 XT CONNECT 2 4 ba75970e01 10 2012...
Page 123: ...System 2020 XT CONNECT Settings setup 5 11 ba75970e01 10 2012 Fig 5 10 Edit list of sensors...
Page 138: ...Settings setup System 2020 XT CONNECT 5 26 ba75970e01 10 2012...
Page 152: ...Network connection System 2020 XT CONNECT 6 14 ba75970e01 10 2012...
Page 178: ...PROFIBUS connection option System 2020 XT CONNECT 8 12 ba75970e01 10 2012...
Page 180: ...Maintenance and cleaning System 2020 XT CONNECT 9 2 ba75970e01 10 2012...
Page 194: ...What to do if System 2020 XT CONNECT 10 14 ba75970e01 10 2012...
Page 204: ...Accessories and options System 2020 XT CONNECT 12 2 ba75970e01 10 2012...
Page 212: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 8 ba75970e01 10 2012...
Page 215: ......