
inoLab
®
Multi 9310 IDS
Commissioning
ba75937e10
08/2021
15
3.3.2 Connecting the power pack
3.3.3 Mounting the stand
The stand base can be mounted at the right side of the meter.
CAUTION
The line voltage at the operating site must lie within the input
voltage range of the original power pack (see section
CAUTION
Use original power packs only (see section
1.
Connect the plug of the power pack to the socket for the power pack on
the Multi 9310 IDS.
2.
Connect the original power pack to an easily accessible power outlet.
1
2
Summary of Contents for inoLab Multi 9310 IDS
Page 92: ...Transmitting data inoLab Multi 9310 IDS 92 ba75937e10 08 2021 ...
Page 113: ......