
Installation
System 182
3 - 24
ba75504e07
04/2012
3.5.4
Top hat rail mounting
Materials required
THS/IQ kit for top hat rail mounting (see chapter 11 A
Tools
Phillips screwdriver.
Mounting the Universal
Transmitter on a top hat
rail
Fig. 3-21 Mounting the Universal Transmitter on a top hat rail
1
Screw the clamping assembly (pos. 1 in Fig. 3-21) onto the
back of the Universal Transmitter with the two plastic tapping
screws (pos. 2).
2
Attach the Universal Transmitter onto the top hat rail from
above using the clamping assembly and press against the rail
until the clamping assembly clicks into place. The Universal
Transmitter can be moved sideways afterwards.
3
To unhook the Universal Transmitter, press it downward and
pull it forward at the bottom.
B
ei
St
apelm
ont
age
A
ufkleber
ent
fernen
und
K
ont
aktträger
m
ontieren
For
st
ack
m
ounting
rem
ove
label
and
inst
all
cont
act
carrier
1
2
Summary of Contents for DIQ/S 182-MOD
Page 6: ...Contents System 182 0 4 ba75504e07 04 2012...
Page 10: ...Overview System 182 1 4 ba75504e07 04 2012...
Page 14: ...Safety instructions System 182 2 4 ba75504e07 04 2012...
Page 78: ...Operation System 182 4 18 ba75504e07 04 2012...
Page 84: ...The SETTINGS menu System 182 5 6 ba75504e07 04 2012...
Page 110: ...Relay outputs System 182 6 26 ba75504e07 04 2012...
Page 126: ...Maintenance and cleaning System 182 8 2 ba75504e07 04 2012...
Page 132: ...What to do if System 182 9 6 ba75504e07 04 2012...
Page 144: ...Accessories and options System 182 11 2 ba75504e07 04 2012...
Page 148: ...Appendix store separately if required System 182 13 2 ba75504e07 04 2012...
Page 149: ......