System 182
Installation
3 - 13
ba75504e07
04/2012
Preparing the cable
ends
Fig. 3-11 Prepared cable end
Connecting the cables
The SNCIQ and SNCIQ/UG cables are connected to the terminal strip
in the same way as the SACIQ sensor connection cable (see
section 3.4.5):
1
Cut off the cable to the required length.
2
Remove approx. 45 mm of cable insulation (in the case of the
SNCIQ/UG earth cable, remove both the inner and outer
insulation).
3
Only for the SNCIQ/UG earth cable:
strip the outer insulation for a further 35 mm.
4
Shorten the exposed shielding braid up to the cable sheath.
5
Shorten the two fillers (plastic inlays) up to the cable sheath.
6
Bare the red and green wires and fit them with wire end
sleeves.
7
Fit the filler stranded wire with a wire end sleeve.
SNCIQ
SNCIQ/UG
approx. 35 mm
approx. 45 mm
approx. 45 mm
1
Open the enclosure of the Universal Transmitter or
MIQ module.
2
Select a free SENSORNET connection. At the same time, look
out for the SENSORNET designation on the label on the
bottom of the enclosure.
Summary of Contents for DIQ/S 182-MOD
Page 6: ...Contents System 182 0 4 ba75504e07 04 2012...
Page 10: ...Overview System 182 1 4 ba75504e07 04 2012...
Page 14: ...Safety instructions System 182 2 4 ba75504e07 04 2012...
Page 78: ...Operation System 182 4 18 ba75504e07 04 2012...
Page 84: ...The SETTINGS menu System 182 5 6 ba75504e07 04 2012...
Page 110: ...Relay outputs System 182 6 26 ba75504e07 04 2012...
Page 126: ...Maintenance and cleaning System 182 8 2 ba75504e07 04 2012...
Page 132: ...What to do if System 182 9 6 ba75504e07 04 2012...
Page 144: ...Accessories and options System 182 11 2 ba75504e07 04 2012...
Page 148: ...Appendix store separately if required System 182 13 2 ba75504e07 04 2012...
Page 149: ......