wsm Kubota U15 Workshop Manual Download Page 7

WSM U15, U15-3 Service

I-S-6

C.Important Safety process and critical functional process

The following instructions are related to essential adhesives, important safety process   and critical func-
tional process   .Pay special attention in servicing these process. (Pay also close attention in reconnecting
the electrical cables.)

a. Essential Adhesives

Type of screw adhesive

• Unless otherwise specified, use Three-Bond 1324 adhesive (medium-duty type).

Keep the screw threads free of oil and water.

Type of instantaneous adhesive

• Use Three-Bond 1733 or Three-Bond 1741E adhesive.

Keep the bond areas free of oil and water.

b. Important Safety Process 

 .

1. Reconnecting the fuel hose (clearance, hose routes, clamps, etc.)

2. Electrical cabling (engine, instrument panal, controls, etc.) (wiring routes, clamps and couplers)

c. Important Critical Functional Process 

 .

1. Setting up the travel wheel motor (tightening torque)

2. Reassembling the rotary joints (joint direction and shaft set-up)

3. Installing the swivel base bearing and the swivel motor (tightening torque)

4. Fitting the pump couplings (tightening torque)

D.Important inspection items after reassembling

a. Operate the Machine and check for Unusual Noise and Vibrations.
b. Make Sure the Safety decals and Wireharness Clamps are in their

Specified Positions.

c. With the Machine Front in a Specified Posture, Check the Amount of

Hydrauric Oil

Checking the oil level (For further datails, refer to the Operator’s Manual of each model.)

1) Park the machine on a level ground.

2) Make sure the hydrauric oil temperature is in the range of 10-30°C (50-86°F) and see if the oil level is

within the specified zone of the oil level gauge.

3) Extend the track cyrinder to Max. position.

4) Keep the machine front as shown as following posture.

Posture: Extend the rods of the arm and bucket cylinders to max. Place the bucket link on the ground, the

offset swing at the center, and the dozer also on the ground.

S

A

S

A

Leftward 
swinging

Some space needed

Specified 
machine posture

Red circle

Oil gauge (level)

Summary of Contents for Kubota U15

Page 1: ...WORKSHOP MANUAL KUBOTA EXCAVATOR U15 Code No 97899 61282 Service Chapter U15 3...

Page 2: ...CONTENTS V Electrical system IV Hydraulic System III Engine II Machine Body I General...

Page 3: ...ibrations I S 6 b Make Sure the Safety decals and Wireharness Clamps are in their Specified Positions I S 6 c With the Machine Front in a Specified Posture Check the Amount of Hydrauric Oil I S 6 d Pi...

Page 4: ...ble should occur during use or if servicing is necessary contact the dealer who handles the machine At that time please inform the machine model and engine type and serial numbers Name plate Code No R...

Page 5: ...propriate space needed for disas sembly to the job 2 Secure a clean safe place for arranging dis assembled parts 3 Store volatile substances gasoline light oil thinner oily articles etc in appropriate...

Page 6: ...ng 3 Separated parts must be correctly reassembled using alignment marks 4 As a rule use a press to reassembled bearings bushing and oil seals Use pads when using a ham mer e Maintenance CAUTION When...

Page 7: ...the rotary joints joint direction and shaft set up 3 Installing the swivel base bearing and the swivel motor tightening torque 4 Fitting the pump couplings tightening torque D Important inspection it...

Page 8: ...e s taper for dust deposits and scratches When the pipe socket has been tightened up wipe the joint clean Apply the maximum operating pres sure 2 or 3 times to make sure there is no oil leak 2 Hydraul...

Page 9: ...15 0 17 0 108 5 123 0 41 mm 1 61 in Thread size piping screw Tightening torque N m kgf m ft lbf Spanner size reference Remarks Steel pipe OD R tapered thread G straight thread 1 8 19 6 29 4 N m 2 0 3...

Page 10: ...50 60 RC401 63190 11 32 44 RD411 63820 12 32 51 68311 72830 Steel pipe size O D I D Thickness Tightening torque N m kgf m ft lbf Spanner size reference Remarks 8 6 1 mm 0 31 0 24 0 04 in 29 4 39 2 3 0...

Page 11: ...12 00 kgf m 75 9 86 8 ft lbf M14 107 9 125 5 N m 11 00 12 80 kgf m 79 6 92 6 ft lbf 123 6 147 1 N m 12 60 15 0 kgf m 91 1 108 5 ft lbf 166 7 196 1 N m 17 00 20 00 kgf m 123 0 144 7 ft lbf M16 166 7 1...

Page 12: ...G1 2 60 65 N m 6 0 6 5 kgf m 43 47 ft lbs G3 4 118 127 N m 12 0 13 0 kgf m 87 94 ft lbs G1 118 127 N m 12 0 13 0 kgf m 87 94 ft lbs 11 Adhesives 1 Thread adhesive No oil and water allowed on the threa...

Page 13: ...k hydraulic oil level daily Check fuel level daily Check coolant level daily Lubricate front end attachments daily Checking the radiator and oil cooler daily Check electric cables and connections dail...

Page 14: ...vel daily Check fuel level daily Check coolant level daily Lubricate front end attachments daily Checking the radiator and oil cooler daily Check electric cables and connections daily Check water sepa...

Page 15: ...00 Interval Check adjust V belt tension 250 h Check coolant hoses and clamps 250 h Grease pilot valve linkage 250 h Change engine oil and oil filter 500 h Replace the fuel filter 4 500 h Change return...

Page 16: ...kage 250 h Change engine oil and oil filter 500 h Replace the fuel filter 4 500 h Change return filter for the hydraulic oil tank 3 Please contact your KUBOTA dealer 500 h Replace the drive unit oil 5...

Page 17: ...lt tension adjust every 200 hrs 12 Radiator hoses and clamps check every 200 hrs replace every 2 years 13 Air filter element Outer element clean every 200 hrs 2 replace every 1000 hrs 2 Inner element...

Page 18: ...aily check change every 500 hrs 4 Hydraulic oil check Daily check change every 1000 hrs 1 5 Lubrication points Daily check 6 Radiator and oil cooler check Daily check 7 Engine and electrical wiring ch...

Page 19: ...Thank you very much for your reading Please click here and go back to the website Then you can download the complete manual instantly No waiting...

Reviews: