![Worldwide Construction And Forestry Division 380GLC Operator'S Manual Download Page 102](http://html1.mh-extra.com/html/worldwide-construction-and-forestry-division/380glc/380glc_operators-manual_998038102.webp)
Operation—Operating the Machine
TX,BEFORE,WORK -19-18MAY20-1/1
DB84312,00000C4 -19-22FEB12-1/1
Before Starting Work
Review the operating precautions. See
Safety—Operating Precautions. (Section 1-3.)
Use seat belt when operating machine.
Remember to
fasten seat belt even during brief periods of use.
T133556
—UN—24AUG00
Reading Operator's Manual
Operator's Daily Machine Check Before
Starting
Safety and Protective Devices Checks
Walk around machine to clear all persons from machine
area before starting machine.
Clear all steps and walking surfaces.
Check condition of guards, shields, and covers.
Overall Machine Checks
Check for worn or frayed electrical wires and loose or
corroded connections.
Inspect machine for bent, broken, or loose parts.
Check for loose or missing hardware.
Check for oil leaks, missing or loose hose clamps, kinked
hoses, and lines or hoses that rub against each other or
other parts.
1— Check Pedal and Lever
Movement/Clean Out Cab
Debris
2— Check Hydraulic Oil Level
3— Check Surge Tank Level
4— Check Engine Oil Level
5— Check/Clean Radiator and
Oil Cooler Outer Fins
1
2
5
3
4
TX1000291
—UN—15NOV05
Inspect Machine Daily
2-3-1
092221
PN=102
Summary of Contents for 380GLC
Page 6: ...Introduction Continued on next page TX JDEULA 19 11JUL16 2 3 TX1219046 UN 11JUL16 092221 PN 6...
Page 7: ...Introduction TX JDEULA 19 11JUL16 3 3 TX1219047 UN 14JUL16 092221 PN 7...
Page 9: ...Introduction DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 092221 PN 9...
Page 17: ...Introduction DX EMISSIONS CARB 19 26AUG20 8 8 RG32759 UN 19AUG20 092221 PN 17...
Page 24: ...Introduction 092221 PN 24...
Page 287: ...Index Index 11 092221 PN 11...
Page 288: ...Index Index 12 092221 PN 12...