2 of 3 Workrite Ergonomics | 800.959.9675 www.workriteergo.com
Worksurface
back edge
Worksurface
back edge
flush with back edge
Cordless Drill with
⅛
Drill bit
Determine mounting placement underneath the worksurface. Back of Mounting Hook should be flush with the
back edge of worksurface.
Use pen/pencil to mark
the pre-drill location for
the (4) screws.
Once pre-drill location is
marked, remove Mesh Trough
from Mounting Hooks.
DO NOT DRILL
DEEPER THAN ½”
Pre-drill two pilot holes per Hook using
⅛
Drill bit
1b
1b
2a
2a
2a
1c