Commissioning
The following tables illustrate Sense I commissioning requirements on installation or
first start-up following a reset.
Zone controller with wiring module
(systems with several heating circuits without higher-level control)
▶ Switch system ON/reset Sense I.
The Display shows 3 dashes, until the connection to the boiler is
established and Sense I asks for heating circuit selection (HC1
appears blinking).
▶ Select and confirm heating circuit (H.C = HC1...HC4).
▶ Close the service level.
The room temperature is displayed and Sense I works as a zone
controller.
Room controller (systems with one heating circuit)
▶ Switch system ON/reset Sense I.
The Display shows 3 dashes, until the connection to the boiler is
established.
▶ Set and confirm A.1 = CO.
▶ Close the service level.
The room temperature is displayed and Sense I works as a room
controller.
Room thermostat (systems with several heating circuits with higher-level
control, e. g. Sense II)
▶ Switch system ON/reset Sense I.
The Display shows 3 dashes, until the connection to the boiler is
established.
▶ Set and confirm A.1 = Fb.
▶ Select and confirm heating circuit (H.C = HC1...HC4).
▶ Close the service level.
The room temperature is displayed and Sense I works as a room
thermostat.
°C
°F
°C
°F
°C
°F
°C
°F
°C
°F
°C
°F
°C
°F
°C
°F
°C
°F
°C
°F
°C
°F
Summary of Contents for Greenstar Sense I
Page 18: ...18 6 720 648 748 2014 03 Notes...
Page 19: ...19 6 720 648 748 2014 03...