4
General Information
Greenstar Heatslave II External
ErP
– 6 720 813 722 (2014/09)
2
General Information
2.1
Energy efficiency
Energy efficiency information is given in the Installation,
Commissioning and Servicing Instructions supplied with the
appliance.
2.2
Servicing
The Service Checklist can be found at the rear of the boiler’s
installation instructions. It will be required in the event of any
guarantee work and may be required by the local Building
Control Inspector.
▶ Have the boiler serviced regularly by a competent, OFTEC
registered engineer.
▶ Ensure that the service engineer completes the Service
Record, at the rear of the Installation, Commissioning and
Servicing Instruction manual, after each service.
▶ Have any work carried out only by a competent, OFTEC
registered engineer.
▶ Always use original spares, to help maintain the efficiency,
safety and reliability of the appliance.
2.3
User caution
•
It is forbidden for any interference with the appliance other
than those actions allowed in this document.
3
Using your boiler
3.1
Controls
To access controls:
To access controls first remove the front panel:
▶ Unscrew the two screws [A] on the bottom of the front
panel using the tool [B] provided.
The panel will drop down and can be carefully removed.
▶ Pull control drawer [C] fully forwards.
To replace:
▶ Push control drawer [C] firmly back into place.
▶ Push the front panel up behind the top panel, push in and
secure in place with the screws [A] using tool [B].
Fig. 1
CAUTION:
Incorrect use
▶ Any incorrect use can result in danger to
the householder.
6 720 805 212-01.1TL
A
B
C
A
CONTROLS