![Woodway ST PPS 43 Med User Manual Download Page 90](http://html1.mh-extra.com/html/woodway/st-pps-43-med/st-pps-43-med_user-manual_995959090.webp)
84 | UM-PP-EN-03
Installation
The quick disconnects must be open before installation. Only unscrew the clamp to the extent that
the opening is slightly larger than the diameter of the railing tube, but that the screw does not fall
out. Place the crossbar diagonally between both handrails so that both clamps grip the railing. The
quick disconnects must face outwards. Then align the crossbar horizontally and hand-tighten the
quick disconnects.
NOTE
Ensure that handles of quick disconnects are positioned parallel to
crossbar.
The levers are equipped with a spring mechanism, which allows the
handle to be unlatched and moved into the right position without
having to loosen the screw.
Fig. 48 Video railing lever position, PPS Ortho
1.
Incorrect lever position for the quick disconnect; danger of injury
To correct, pull out lever, rotate 90°, and release
2.
Correct lever position for the quick disconnect; lever rests on the crossbar
1
2
X