Woodward SPM-D Series Manual Download Page 1

37616B 

 
 

 
 
 
 

 

 
 
 

 

 

Manual  

From Release 7.10-0

 

Manual 37616B

 

SPM-D2-10B/PSY5 
Synchronizing Unit 

 

Summary of Contents for SPM-D Series

Page 1: ...37616B Manual From Release 7 10 0 Manual 37616B SPM D2 10B PSY5 Synchronizing Unit...

Page 2: ...charging device is turned off before disconnecting the battery from the system Electronic controls contain static sensitive parts Observe the following precautions to prevent dam age to these parts Di...

Page 3: ...er Service is available for technical information Please see last page for the contact data Warranty terms Please enquire about the terms of warranty from your nearest Woodward representative For our...

Page 4: ...FU D W power supply 90 250 Vac or 120 375 Vdc 11 Reference point 12 Power supply standard SPM D2 10B PSY5 FU D W 12 Measuring inputs 13 System 2 13 System 1 14 Discrete inputs 15 Relay outputs 16 Cont...

Page 5: ...igure controller 35 No load control 35 Frequency controller 36 Synchronization time monitoring 42 Black start 43 Relay output 16 17 44 Password configuration 45 CHAPTER 8 COMMISSIONING 46 APPENDIX A D...

Page 6: ...supply 90 250 Vac 120 to 375 Vdc SPM D2 10B PSY5 FU D W 12 Figure 4 6 Measuring inputs voltage system 2 13 Figure 4 7 Measuring inputs Voltage system 1 14 Figure 4 8 Discrete inputs 15 Figure 4 9 Rela...

Page 7: ...has been developed for a unit fitted with all available options Inputs outputs func tions configuration screens and other details described which do not exist on your unit may be ignored The present m...

Page 8: ...astic bottles etc away from the control modules and work ar ea as much as possible 4 Opening the control cover may void the unit warranty Do not remove the printed circuit board PCB from the control c...

Page 9: ...d near to the unit and in a position easily accessible to the op erator This must also bear a sign identifying it as an isolating switch for the unit NOTE Inductivities connected such as coils of oper...

Page 10: ...2 8 9 CB 3 CB alternatively 3 Drive G R eply C Bisopen EnableC B V oltagesystem2 Com m on term 3 4 5 6 Enableisolatedoperation blackstart Activationofparam eter set B 0 1 5 2 6 Readinessforoperation 7...

Page 11: ...pen EnableC B V oltagesystem2 Com m on term 3 4 5 6 Enableisolatedoperation blackstart Activation of Parameter Set B 0 5 6 Readinessforoperation 7 1 9 Function make contact 1 8 The socket for the PC c...

Page 12: ...h three conductor systems do not connect Sold lug Power supply standard SPM D2 10B PSY5 FU D W 24 Vdc 25 1 2 24 Vdc 0 Vdc Power supply Standard Figure 4 4 Power supply 24 Vdc standard Terminal Descrip...

Page 13: ...e low voltage system Connection to medium voltage via two pole isolated transformer e g in the case of a V connection and Connection to medium voltage via single pole isolated transformer e g Y connec...

Page 14: ...L2 L3 2 3 1 MCB Figure 4 7 Measuring inputs Voltage system 1 Note Connection corresponding to the mains configuration see wiring diagram Terminal Measurement Description Amax Connection to the measur...

Page 15: ...specified destroy the hardware Maximum input range 18 250 Vac D Signal device CB Reply CB Enable CB Reply CB is open B A 18 250 Vac dc C 3 Figure 4 8 Discrete inputs Terminal Associated zero terminal...

Page 16: ...outputs I CB control Root Switched Description Amax A B 14 15 Synchronizing pulse Command close CB 2 5 mm max 250 V AC A B external device Relay output Figure 4 10 Relay outputs control outputs II mes...

Page 17: ...ut signals can be selected by configuration which are connected in different ways SPM D2 10B PSY5 D max 250 Vac 11 12 13 Voltage controller Common Raise Lower Voltage controller 8 Common Speed control...

Page 18: ...itions terms must be noticed Input signal Operating condition Cond Relay Command close CB LED Closed LED Enable Discr inp term 5 Enable isolated op Blackstart 0 0 x OFF or automatic no load control C1...

Page 19: ...N B Blackstart Parameter black start gen switch ON One of the three black start options must be switched on and the voltages U1 and U2 must be within the configured limits for the black start C1 Autom...

Page 20: ...al 6 With this discrete input you can switch between the two parameter sets A and B If this discrete input is set the unit works with parameter set B otherwise with parameter set A One set of paramete...

Page 21: ...he frequency controller is operating in two possible stages Frequency correction As long as the difference of the frequency between system 2 and system 1 does not fall below the configured value df st...

Page 22: ...isolated operation must be set to ON More over isolated operation is only possible if the discrete input Release isolated operation black start is set Closing the CB without synchronization black sta...

Page 23: ...en Terminals 14 15 By setting this relay the CB will be closed The relay drops out after the pulse is output Exception Operation mode Synch check Message Connect 2 Terminal 16 17 For the description o...

Page 24: ...e is made of coated plastics All keys have been designed as touch sensitive membrane switch elements The display is a LC display consisting of 2 16 characters which are indirectly illuminated red Cont...

Page 25: ...ernor output frequency lower reduce speed 7 f Governor output frequency raise increase speed 8 V Governor output voltage lower reduce excitation 9 V Governor output voltage raise increase excitation B...

Page 26: ...input is set see also chap ter LED Closed flashes on page 23 5 LED row Color red yellow green Phase position synchroscope The row of LEDs indicates the current phase position between the two voltages...

Page 27: ...f the relay speed raise 8 V Color yellow Governor output reduce voltage Three position controller The LED V indicates if the unit outputs a pulse to decrease volt age The status of the LED corresponds...

Page 28: ...t value is saved by pressing the Select push button once By pressing this push button again the us er causes the system to display the next configuration screen 13 Digit Digit Automatic mode Digit no...

Page 29: ...V 00 00Hz LCD type 2 kV configured 1 00 0kV 00 00Hz 2 00 0kV 00 00Hz Double voltage and double frequency displays Voltage and frequency of system 1 and system 2 are displayed The phase angle between...

Page 30: ...during the online communication all modified parameter will be automatically saved on the device 10 Back up your settings by Settings Save from Device to file A file with the extension WSET will be wr...

Page 31: ...that a backward scrolling of the configuration masks is possible Exception Jumping from the first to the last mask is not possible To do this you must simultaneously press the buttons Select and Curso...

Page 32: ...0 9999 On accessing the configuration mode a code number which identifies the various users is requested The displayed number XXXX is a random num ber RN If the random number has been confirmed with S...

Page 33: ...isible No Parameter 1701 Set factory default values will be hidden Parameter 1701 Set factory default values No Set factory default values Yes No Please note This parameter will become visible only if...

Page 34: ...V The secondary voltage of system 2 is set here in V This entry serves to indi cate the primary voltages in the display In the case of measured voltages of 400 V without a measurement transducer 400 V...

Page 35: ...nd may destroy the auto matically regulated generator Parameter 6662 No load control Automatic idle Running ON Automatic no load control ON OFF ON With the power circuit breaker open frequency and vol...

Page 36: ...is not carried out and the subsequent screens of this option are not displayed Parameter 6655 Freq controller Isol oper ON on SPM D2 10B PSY5 D Isolated operation frequency controller ON OFF ON In iso...

Page 37: ...00ms Freq contr B Time pulse 000ms on SPM D2 10B PSY5 D Minimum frequency controller ON period 10 250 ms For this parameter two values are adjustable The parameter value A is ac tive if the discrete i...

Page 38: ...OFF Control is not carried out and the subsequent screens of this option are not displayed Parameter 6657 Volt controller Isol oper ON on SPM D2 10B PSY5 D Voltage controller isolated mode ON OFF ON I...

Page 39: ...controller ON period 20 250 ms For this parameter two values are adjustable The parameter value A is ac tive if the discrete input at terminal 6 is not set or not mounted The parame ter value B is ac...

Page 40: ...ffset should be at least 0 1 Hz smaller or half the value of dfmax next parameter Please also note the setting of the insensitivity of the controller too Parameter 5701 Synchronization df max 0 00Hz M...

Page 41: ...the relay Close CB Slip synch A TClose CB 000ms Slip synch B TClose CB 000ms Zero phase control OFF Inherent delay of circuit breaker 40 300 ms For this parameter two values are adjustable The parame...

Page 42: ...and system 1 undershoots the value adjusted here Synchronization time monitoring Parameter 3060 Sync time contr Alarm ON Synchronization time monitoring ON OFF ON This setting ensures that the synchro...

Page 43: ...case the approximate value of the voltage of system U2 must be zero and the voltage of system U1 must be applied live bus dead line Parameter 9047 Black start Tmin 00s Min monitoring time of the black...

Page 44: ...ith the add on order terminal 14 15 Thus a two channel relay control is possible during synchronization but also an add on order in case of a dead busbar Synchronous only The relay Message Connect 2 o...

Page 45: ...is automati cally set Parameter 10413 Define level 1 code 0000 Code level 1 Customer 0 9999 This screen first appears in code level 2 password protection active Fol lowing the input of digits in this...

Page 46: ...f measuring voltages or other signals may lead to incorrect functions and damage the unit as well as engines and components connected to the unit Procedure 1 Disconnect the add on orders directly at t...

Page 47: ...hat the setpoint value is controlled at an optimum f Prior to the automatic closing of the circuit breaker ensure that all measuring values have been wired and applied correct In the synchronous point...

Page 48: ...ndix A Dimensions Back plate mounting optionally Front view 2003 09 29 SPM D10B PSY5 Dimensions 4003 ab skf 144 136 Bottom view 108 8 8 72 50 65 179 1 0 24 48 27 35 Back view with connecting terminals...

Page 49: ...NO NO Y N Y N Allow Factory Defaults YES NO NO Y N Y N CONFIGURE BASIC SETTINGS Rated Frequency fn 48 0 62 0 Hz 50 0 Hz Generator freq Setpoint 48 0 62 0 Hz 50 0 Hz Voltage system 1 secondary 50 440...

Page 50: ...tion dV max 0 1 15 0 6 Synchronization Brk hold T 0 04 0 50 s 0 20 s Phase matching ON OFF OFF on off on off Slip synchroniz Max phase 0 60 7 A Slip synch A TClose CB 40 300 ms 80 ms B Slip synch B TC...

Page 51: ...PM D2 10B PSY5 FU D W 90 250 Vac 120 375 Vdc 100 to 240 Vac 15 10 UL rating only Intrinsic consumption Standard max 6 W SPM D2 10B PSY5 FU D W max 10 W 10 VA or 10 W Ambient temperature Standard 20 to...

Page 52: ...1 wire only or equivalent Weight 24Vdc fed types approx 600 g Weight 90 250 Vac 120 375Vdc fed types approx 800 g Protection Protection system IP42 from front with correct installation IP54 from fron...

Page 53: ...r problem can be resolved over the phone If not you can select which course of action you wish to pursue based on the available services listed in this section Returning Equipment For Repair If a cont...

Page 54: ...tment in Stuttgart 49 0 711 789 54 510 They will help expedite the processing of your order through our distributors or local service facility To expedite the repair process contact Woodward in advanc...

Page 55: ...il stgt info woodward com For assistance outside Germany call one of the following international Woodward facilities to obtain the address and phone number of the facility nearest your location where...

Page 56: ...our toll free or local phone numbers e mail us or use our website and reference technical support Product Training is available on site from several of our worldwide facilities or at your location dep...

Page 57: ..._______ REV _____________ Unit type SPMD ____________________________________ Serial number S N _______________________________________ Description of your problem ____________________________________...

Page 58: ...29 70565 Stuttgart Germany Phone 49 0 711 789 54 510 Fax 49 0 711 789 54 101 stgt info woodward com Homepage http www woodward com Woodward has company owned plants subsidiaries and branches as well...

Reviews: