2018-2023 Woodlander
™
(MAX) Operator’s Manual
2. GUSSETS
Using the hardware listed below, assemble the gussets to the track as shown on the next page.
Ensure the track width is set correctly (see track widths on next page), and measure diagonally
to check for squareness. Torque all bolts per the table in section,
.
Track components listed in these tables are
not
included with the trailer package, namely track
rails, reinforcement plates, bunks, and carriage stops. These components are found in the
sawmill crate. If the trailer was purchased for an existing sawmill (i.e. the sawmill is currently
assembled), the track will need to be disassembled prior to building the trailer and the following
assembly instructions performed.
24x
M10 X 30 mm
Flanged Hex
Bolt
2x
Mid Bunk
8x
M10 X 40 mm
Flanged Hex
Bolt
2x
Reinforcement
Plate
32x
M10 Flanged
Lock Nut
4x
End Gusset
2x
End Bunk
6x
Joining Gusset
1x
Centre Bunk
4x
Track Rail
0001675-M-EN: Rev C
Page
of
16
64
07-Oct-2022
Use the fasteners included with the
sawmill trailer to assemble the
track. The fasteners included with
the sawmill track will
not
be used.
Summary of Contents for Woodlander
Page 2: ...This page intentionally left blank ...
Page 30: ...2018 2023 Woodlander MAX Operator s Manual 0001675 M EN Rev C Page of 28 64 07 Oct 2022 ...
Page 42: ...2018 2023 Woodlander MAX Operator s Manual 0001675 M EN Rev C Page of 40 64 07 Oct 2022 ...
Page 66: ...2018 2023 Woodlander MAX Operator s Manual NOTES 0001675 M EN Rev C Page of 64 64 07 Oct 2022 ...
Page 67: ...This page intentionally left blank ...
Page 68: ......