
Multilander
™
Operator’s Manual
7. TONGUE
Using the hardware listed below, assemble the tongue. Torque all bolts per the table in section,
.
First, use the two (2) M12 X 70 mm hex bolts and two (2) M12 flanged hex lock nuts to fasten
the hitch ball coupler to the tongue.
2x
M12 X 80 mm
Flanged Hex
Bolt
1x
Hitch Ball
Coupler
2x
M12 X 70 mm
Hex Bolt
1x
Tongue
2x
M10 X 60 mm
Flanged Hex
Bolt
1x
Jack Support
4x
M12 Flanged
Lock Nut
1x
Chassis Clamp
(50 mm Wide)
2x
M10 Flanged
Lock Nut
2x
Clamping Disk
1x
Jack Stand
MLTR-MY2020-EN: Rev B
Page
of
24
44
22-Jan-2021
Summary of Contents for MULTILANDER
Page 2: ...This page intentionally left blank...
Page 41: ...Multilander Operator s Manual WALKING BEAMS MLTR MY2020 EN Rev B Page of 39 44 22 Jan 2021...
Page 42: ...Multilander Operator s Manual LOG RACKS MLTR MY2020 EN Rev B Page of 40 44 22 Jan 2021...
Page 44: ...Multilander Operator s Manual TONGUE JACK STAND MLTR MY2020 EN Rev B Page of 42 44 22 Jan 2021...
Page 45: ...Multilander Operator s Manual WHEELS MLTR MY2020 EN Rev B Page of 43 44 22 Jan 2021...
Page 46: ...Multilander Operator s Manual NOTES MLTR MY2020 EN Rev B Page of 44 44 22 Jan 2021...
Page 47: ...This page intentionally left blank...
Page 48: ......