
Multilander
™
Operator’s Manual
MLTR-MY2020-EN: Rev B
Page
of
22
44
22-Jan-2021
After the holes in the chassis are
aligned with the holes in the log
rack, use two (2) chassis clamps,
four (4) M10 X 60 mm flanged
hex bolts, and four (4) M10
flanged lock nuts to secure the
log rack to the chassis.
When tightening the bolts, tighten
the left and right sides of each
chassis clamp incrementally until
the clamp is fully seated. Ensure
the clamps do not sit askew.
Summary of Contents for MULTILANDER
Page 2: ...This page intentionally left blank...
Page 41: ...Multilander Operator s Manual WALKING BEAMS MLTR MY2020 EN Rev B Page of 39 44 22 Jan 2021...
Page 42: ...Multilander Operator s Manual LOG RACKS MLTR MY2020 EN Rev B Page of 40 44 22 Jan 2021...
Page 44: ...Multilander Operator s Manual TONGUE JACK STAND MLTR MY2020 EN Rev B Page of 42 44 22 Jan 2021...
Page 45: ...Multilander Operator s Manual WHEELS MLTR MY2020 EN Rev B Page of 43 44 22 Jan 2021...
Page 46: ...Multilander Operator s Manual NOTES MLTR MY2020 EN Rev B Page of 44 44 22 Jan 2021...
Page 47: ...This page intentionally left blank...
Page 48: ......