
Multilander
™
Operator’s Manual
6. LOG RACKS
Using the hardware listed below, assemble the log rack sub-assemblies to the chassis. Torque
all bolts per the table in section,
.
The log racks come pre-assembled from the factory. Note that the rear log rack has two (2)
hinge mounts that must be installed facing rearward.
Slide the rear log rack assembly over the end of the chassis until the holes in the chassis align
with the holes in the log rack.
8x
M10 X 60 mm
Flanged Hex
Bolt
1x
Log Rack
(Rear)
8x
M10 Flanged
Lock Nut
1x
Log Rack
(Front)
4x
Chassis Clamp
(60 mm Wide)
MLTR-MY2020-EN: Rev B
Page
of
21
44
22-Jan-2021
Align Holes
Hinges facing
Rearward
Front end of chassis can be
identified by the two large
tongue clamping disk holes
FRONT
REAR
Summary of Contents for MULTILANDER
Page 2: ...This page intentionally left blank...
Page 41: ...Multilander Operator s Manual WALKING BEAMS MLTR MY2020 EN Rev B Page of 39 44 22 Jan 2021...
Page 42: ...Multilander Operator s Manual LOG RACKS MLTR MY2020 EN Rev B Page of 40 44 22 Jan 2021...
Page 44: ...Multilander Operator s Manual TONGUE JACK STAND MLTR MY2020 EN Rev B Page of 42 44 22 Jan 2021...
Page 45: ...Multilander Operator s Manual WHEELS MLTR MY2020 EN Rev B Page of 43 44 22 Jan 2021...
Page 46: ...Multilander Operator s Manual NOTES MLTR MY2020 EN Rev B Page of 44 44 22 Jan 2021...
Page 47: ...This page intentionally left blank...
Page 48: ......