HM126 Operator’s Manual
3. TRACK
Assemble the track with the provided components and hardware listed in the table below. It is
important to assemble and level the track on a firm foundation before tightening all of the
hardware and should ideally be 3-
½
—4 in [90—100 mm] off the ground. This will allow for easy
cleanup of sawdust and log support height adjustments.
* Centre bunk incorporates four (4) mounting holes at each end
12x
M16 X 120 mm
Hex Bolt
4x
Track Rail
16x
M10 X 35 mm
Flanged Hex
Bolt
2x
Reinforcement
Plate
24x
M10 X 25 mm
Flanged Hex
Bolt
1x
Centre Bunk*
36x
M16 Hex Nut
2x
Mid Bunk
40x
M10 Flanged
Lock Nut
2x
End Bunk
12x
Levelling Foot
Base
4x
Carriage Stop
HM126-MY2021-EN: Rev F
Page
of
16
112
14-Jul-2021
If a Woodland Mills sawmill trailer was
purchased with this sawmill, skip this track
assembly section and follow the track
assembly instructions in those manuals.