HM126 Operator’s Manual
2. UNPACKING
Unpack the contents of the crate except for the sawhead and the two long boxes in the bottom
that contain the sections of track. Unfasten the two (2) M8 bolts/nuts on the front of the crate
using a socket/wrench. Place two (2) 6-8 in [150-200 mm] tall support blocks in front of the
crate, bend the front of the crate down, and then lay the cardboard wall over it. Carefully rotate
the sawhead down onto the cardboard and support blocks and slide it out of the crate as shown
below.
The two long track boxes can now be removed and the crate discarded.
HM126-MY2021-EN: Rev F
Page
of
15
112
14-Jul-2021