Bushlander
™
Operator’s Manual
DRILLING LOCK-DOWN HOLES FOR TRAILER EXTENSION
**Do not drill the holes below for the lock-down brackets if no trailer extension was
purchased. These apply to owners with Bushlander
TM
XL trailer extensions only.**
Place the sawhead on the trailer ensuring it rolls freely along the rails. Measure 64-
¾
in [164.5
cm] from the rear edge of the track rail to the rear post of the sawhead and drill four (4) holes in
the track rails using the provided
⅜
in drill bit. Insert a locking pin into each hole as they are
drilled. Secure each locking pin with a linch pin.
BHLR-MY2020-EN: Rev B
Page
of
26
56
20-Aug-2020
64-
¾
in [164.5 cm]
Summary of Contents for BUSHLANDER
Page 2: ...This page intentionally left blank...
Page 53: ...Bushlander Operator s Manual TRAILER EXTENSION BHLR MY2020 EN Rev B Page of 51 56 20 Aug 2020...
Page 55: ...Bushlander Operator s Manual NOTES BHLR MY2020 EN Rev B Page of 53 56 20 Aug 2020...
Page 56: ...Bushlander Operator s Manual BHLR MY2020 EN Rev B Page of 54 56 20 Aug 2020...
Page 57: ...Bushlander Operator s Manual BHLR MY2020 EN Rev B Page of 55 56 20 Aug 2020...
Page 58: ...Bushlander Operator s Manual BHLR MY2020 EN Rev B Page of 56 56 20 Aug 2020...
Page 59: ...This page intentionally left blank...
Page 60: ......