
Bushlander
™
Operator’s Manual
5. TRACK RAILS
Using the hardware listed below, attach the track rails to the trailer box frame. Do not fully
tighten these bolts.
The track rails and reinforcement plates are not included with the trailer assembly—they are
found in the sawmill crate. If the trailer was purchased for an existing sawmill (i.e. the sawmill is
currently assembled), the track will need to be completely disassembled and these assembly
instructions followed.
8x
M10 X 90 mm
Flanged Hex
Bolt
2x
Track Rail
16x
M10 Flanged
Lock Nut
2x
Reinforcement
Plate
BHLR-MY2020-EN: Rev B
Page
of
11
56
20-Aug-2020
Sandwich the reinforcement plate
between the trailer frame and track
rails at the rail joint. Be sure the
four (4) M10 X 90 mm bolts pass
through only the front & rear holes
in the reinforcement plates.
Summary of Contents for BUSHLANDER
Page 2: ...This page intentionally left blank...
Page 53: ...Bushlander Operator s Manual TRAILER EXTENSION BHLR MY2020 EN Rev B Page of 51 56 20 Aug 2020...
Page 55: ...Bushlander Operator s Manual NOTES BHLR MY2020 EN Rev B Page of 53 56 20 Aug 2020...
Page 56: ...Bushlander Operator s Manual BHLR MY2020 EN Rev B Page of 54 56 20 Aug 2020...
Page 57: ...Bushlander Operator s Manual BHLR MY2020 EN Rev B Page of 55 56 20 Aug 2020...
Page 58: ...Bushlander Operator s Manual BHLR MY2020 EN Rev B Page of 56 56 20 Aug 2020...
Page 59: ...This page intentionally left blank...
Page 60: ......