Page 3: ...derations 10 3 1 Pellets 10 3 2 Considerations for Installation 11 3 3 Operating Area 12 3 4 Connection to the Flue 13 3 5 Operating Problems Caused by Draft Defects in the Flue 14 3 6 Plumbing Connec...
Page 4: ...yed or if it is in poor condition ask for a copy from your retailer or directly from the manufacturer providing product identification data Information which is essential or that requires special atte...
Page 5: ...fer management Automatic routine maintenance shutdown Self cleaning heat exchanger Self cleaning burner grate Factory fitted pump automatic air vent and water pressure sensor Easily accessible service...
Page 6: ...uction E Compact S Page 4 www woodco energy com PRV Pump Flow Pipe Auger Feed Motor Air Compressor and Reservoir Tank Pellet level Sensor Boiler Cleaning Motor Automatic Air Vent Removable Burner Grat...
Page 7: ...of the fuel is attempted by directing hot air at the fuel If a flame is detected by the end of this stage it enters the last stage of ignition Stabilisation This final ignition stage aids further deve...
Page 8: ...oid coming into contact with these parts without adequate protective clothing or suitable implements such as gloves with thermal protection or implements which keep the hands cool Carefully explain th...
Page 9: ...the ignition system breaks down INFORMATION In case of any problems get in touch with your dealer or a qualified engineer authorised by supplier and if a repair is necessary insist on the use of orig...
Page 10: ...e requirements for the flue installation particularly in relation to draught is the responsibility of the system owner Compliance with Local Building Regulations must be adhered to The warranty does n...
Page 11: ...e devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obtained for...
Page 12: ...s a calorific power of 4 4 kW kg with 15 moisture therefore after about 18 months seasoning the equivalent figure for pellets is 4 9 kW kg To ensure good combustion the pellets must be stored in an ar...
Page 13: ...h external ventilation if located indoors provided with an earth connection complying with CEI 64 8 The appliance must be connected to a flue pipe or an internal or external vertical duct conforming t...
Page 14: ...ssible to install the appliance where another heating appliance is installed fireplace stove etc which does not have its own independent air intake Locating the appliance in a room with an explosive a...
Page 15: ...es will also be under negative when connected to an efficient flue pipe as directed All sections of the flue must be capable of inspection and removable to enable periodic internal cleaning Position t...
Page 16: ...ressure and low pressure zones not only outside the building but inside as well In rooms directly exposed to the wind 2 an indoor high pressure area can be created which can augment the draught in boi...
Page 17: ...el oil boiler etc it is even more advisable to call in qualified personnel who subsequently will be responsible for conformity of the system with current applicable law The manufacturer will not be he...
Page 18: ...to ensure that all the required components to complete the kit have been supplied In the unlikely event of an omission you must notify the manufacturer within 48 hrs of delivery The Manufacturer reser...
Page 19: ...d project a min 100mm beyond the sides and the rear of the appliance and at least 600mm to the front The plinth must be capable of supporting the weight of the appliance when full with fuel and the pl...
Page 20: ...unit shall have a 30mA RCD installed into the mains supply It is recommended that a power isolation switch is located adjacent to the boiler to isolate the power during servicing and maintenance but...
Page 21: ...X SCHEMATIC E Compact S Page 19 Installation Assembly Only authorised personnel may open the control panel Any tampering with the Control panel will immediately invalidate the warranty www woodco ener...
Page 22: ...mpact S Page 20 Installation Assembly Only authorised personnel may open the control panel Any tampering with the Control panel will immediately invalidate the warranty www woodco energy com WOODCO En...
Page 23: ...els is recommended for the boiler plus additional expansion for the heating and domestic hot water system The pump is on the return pipework just before the boiler It is recommended that a by pass pip...
Page 24: ...dure to turn it off Only when the system has been fully vented can the boiler be commissioned The installation and the design of the central heating system must be in accordance with BS EN 14336 2004...
Page 25: ...es the boiler time to settle and match the heat demand of the property It is also when the boiler is most efficient If the boiler is not being controlled by a time clock then it can be turned on and o...
Page 26: ...l level gauge needs to be set On the main screen tap the menu icon This will display the menu screen shown above Bring the Boiler Settings icon to the center of the screen and tap on this icon this br...
Page 27: ...l and the boiler is ready to run When the boiler is first installed the auger is empty To fill the auger ready for the boiler to be run requires running the auger until fuel is deposited into the pot...
Page 28: ...Settings menu Tap on the encryption menu and select the encryption that matches your broadband system This is generally WPA2 and is the recommended encryption Tap on the SSID menu and enter your route...
Page 29: ...n combustion chamber The frequency of emptying the ash pan is determined by the quantity of fuel burnt and after 250kg the controller will display a warning to empty the ash pan A daily check during t...
Page 30: ...ys make sure that before you open the main combustion chamber door that the boiler has been switched off and has been allowed to cool down sufficiently so as not to cause injury Always empty ash into...
Page 31: ...llow any foreign material to enter the hopper This will lead to the malfunction of the auger system and could cause damage to the appliance and invalidate your warranty Always close the lid to the hop...
Page 32: ...E Compact S Page 30 Boiler Operation Maintenance www woodco energy com Outdoor Model Dimensions WOODCO Energy...
Page 33: ...e appliance into position The illustration below indicates the weight distribution of the appliance 2 3rd dry weight in this area Always protect the appliance when transporting on trollies or hand car...
Page 34: ...Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date...
Page 35: ...Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date...
Page 36: ...Head Office WoodCo Energy SA Rte de Courgenay 38 2900 Porrentruy Switzerland t 41 324668008 WoodCo Energy Ireland Unit D Cahir Business Park Cahir Co Tipperary Ireland t 353 52 7445330 w www woodco e...