background image

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

READ ALL INSTRUCTIONS BEFORE UNPACKING THE PRODUCT

2 PEOPLE ARE REQUIRED TO LIFT AND DURING
ENTIRE INSTALLATION OF THIS PRODUCT

INSTRUCTIONS THAT, IF IGNORED COULD RESULT IN DEATH OR SERIOUS INJURY CAUSED BY INCORRECT HANDLING

OR INSTALLATION OF THE PRODUCT. THESE INSTRUCTIONS MUST BE OBSERVED FOR SAFE INSTALLATION.

This products must be installed by a fully insured and licensed plumber only. Installa

ti

on of any our product by anyone other

than fully insured and licensed plumber shall void limited warranty. We recommends that such licensed plumber have experience
in the installa

ti

on of products.

Limited warranty is void on any commercial installa

ti

on

We are not responsible for local code compliance for this product. Building and plumbing codes may vary from state-to-state in
accordance to your loca

ti

on. We are not resonsible for providing any compliance cer

ti

fi

ca

ti

ons.

Under no circumstances we are shall not be liable for any and all incidental damages sustained in connec

ti

on with this product

Neither manufacture, nor distributor, nor retailer is responsible for water damage or 

fl

ood caused due to use of this product.

Under no circumstances We shall not be liable for any and all fees, cost of installa

ti

on/reinstalla

ti

on/removal, subsequent

damage or transporta

ti

on in case of the product defect

INSTALLATION   AND   CARE   GUIDE

PREFERED
EDUCATION
PROVIDER

LISTED

TM

ICC

•  2015 Uniform Plumbing Code    

( UPC )

• 2018 International Plumbing Code    

( IPC )

• 2018 International Residential Code    

( IRC )

•  CSA  B45.5 / IAPMO  Z124-2017- Plastic Plumbing Fixtures    

®

®

®

Compliance with the following codes & standard:

Customer Service Phone: 562-229-0088. (Monday - Friday 9 AM - 5 PM Paci

fi

c Time)

Or Email: [email protected]

1

SCC  Accredited

CB-P/S  

OCPS

Accrédité 

CCN

ANSI

ACCREDITED

                ISO/IEC 17065     
     Product Certification Body
                    #1000

20114 REV. 2

MODERN ALCOVE  BATHTUB

B T A 1 5 3 1 R   / B 1 5 3 1 R         B T A 1 5 3 2 L   / B 1 5 3 2 L

Summary of Contents for BTA1531R

Page 1: ...le for providing any compliance certifications Under no circumstances we are shall not be liable for any and all incidental damages sustained in connection with this product Neither manufacture nor distributor nor retailer is responsible for water damage or flood caused due to use of this product Under no circumstances We shall not be liable for any and all fees cost of installation reinstallation...

Page 2: ... is level If needed level subfloor with leveling compound or mortar over the entire area of installation Cut subfloor to accommodate plumbing in compliance with local plumbing and building code Verify your bathtub for final dimensions 30 60 20 1 4 Position bathtub Verify that the draining pipe location matches the actual location of the bathtub drain Remove the bathtub Hacksaw Drill 30 60 20 1 4 B...

Page 3: ...imensions 1 2 20 1 4 1 16 13 1 4 BTA1531R B1531R BTA1532L B1532L 60 41 1 2 4 7 1 2 3 3 4 3 1 4 3 8 30 17 3 4 10 1 2 3 3 3 1 8 3 1 8 20 1 4 1 16 13 1 4 60 41 1 2 4 7 1 2 3 3 4 3 1 4 3 8 30 17 3 4 10 1 2 3 3 3 1 8 3 1 8 ...

Page 4: ... hold skirt at 90 degrees from top of tub Framing Square 3 While held in place install L Bracket utilizing provided screws Attach the flat side to the mounting block and the angled side to reinforced skirt No pre drilling required 4 Install the other two L brackets in the same manner 4 x 10mm ...

Page 5: ...5 Must be tighten up to prevent water leakage 1 Use Teflon Sealing Tape 2 3 Install flex drain ...

Page 6: ...adjustment with a level The bathtub must be tested before installation is completed Fill the tub to the overflow and inspect it for leaks Tighten any loose connections Fasten bathtub to studs framing Shim if necessary Lock the adjustment by tighten the hexagon nut ...

Page 7: ... between the bathtub rim and the finished wall Stud Cement board Tile adhesive Tile Bathtub 3 to 4 mm gap Silicone Shim if necessary Reference for Correct Tile Flange Installation Use drawing below as a reference guide for rough in measurements ...

Page 8: ...enance Please don t hesitate to contact us if you have any questions or concerns Customer Service Phone 562 229 0088 Monday Friday 9 AM 5 PM Pacific Time Or Email help woodbridge gmail com The bathtub must be installed and used as described in this manual Use caution when entering or exiting the bathtub Do not permit children or persons with infirmities to use the bathtub without supervision of an...

Reviews: