![Wood-mizer LT60HD Safety, Setup, Operation & Maintenance Manual Download Page 30](http://html1.mh-extra.com/html/wood-mizer/lt60hd/lt60hd_safety-setup-operation-and-maintenance-manual_994515030.webp)
Sawmill Setup
Stationary Sawmill Setup
3
3-1
60HD-Rdoc072619
Sawmill Setup
SECTION 3 SAWMILL SETUP
3.1
Stationary Sawmill Setup
Prepare a firm, level area where the sawmill can be anchored. There should be enough
room around the sawmill for operators, sawdust removal, log loading and board removal.
A cement pad with 5/8” diameter anchor bolts is recommended. The cement pad should
be rated to support 6350 lbs./sq.ft. at each sawmill foot position.
for stationary sawmill foot anchor locations.
sawmill with bed extension foot anchor locations.
sawmill installation instructions.
LT70DCS Only:
Replace the hitch with the provided front stationary DCS leg assembly
as shown below. Reinstall the guide cable to the leg bracket.
NOTE:
Make sure the unit is level before securing. It IS possible to twist the mill frame by
jacking one foot higher than the others.
WARNING!
Securely fasten the feet of a stationary sawmill
to the floor before operating the sawmill. Failure to do so
may result in serious injury or death.
FIG. 3-1
600514-1
Guide Cable
Leg