Troubleshooting Guide
Circuit Breaker Operation
4
4-11
HDdoc012020
Troubleshooting Guide
See Figure 4-2.
1.
Remove the fuse box cover and remove the stud from its storage position inside the fuse box.
2.
Thread the extension stud on the bottom-right fuse terminal.
3.
Attach the positive cable from a battery charger or jumper cables to the extension stud.
4.
Connect the negative cable from the charger or jumper cables to a grounded metal surface. The mounting
bolts on the bottom of the control box are an acceptable ground.
5.
Charge or jump the battery until it can supply enough power to raise the saw head.
6.
After the saw head is raised, remove the negative cable from ground.
7.
Remove the positive cable from the extension stud.
8.
Remove the extension stud from the fuse terminal and return it to its storage location.
9.
Remove the battery box lid and connect the positive cable directly to the positive battery terminal.
10.
Connect the negative cable to a grounded metal surface.
11.
After the battery is completely recharged, remove the negative charger cable from ground. Remove the posi-
tive cable from the battery and replace the battery box lid.
4.10 Circuit Breaker Operation
Sawmill controls are equipped with manual reset circuit breakers to protect the electrical circuits.
FIG. 4-2
Place stud on
bottom right
fuse terminal
3H0417
Extension stud
storage location
Place stud on
bottom right
fuse terminal
Extension stud
storage location