SETUP & OPERATION
Sawmill Setup
3
3-1
doc063022
SETUP & OPERATION
SECTION 3 SETUP & OPERATION
3.1
Sawmill Setup
IMPORTANT!
Before starting to use the sawmill you have to meet the
following conditions:
Set up the sawmill on firm and level ground.
Under roof, the sawmill can be operated with a sawdust collection system only.
The sawmill can’t be operated outdoor when it is raining/snowing and in case of rain/snow
the sawmill must be stored under roof or indoor.
The sawmill can be operated in temperature range from -15
o
C to 40
o
C only.
The illuminance at the operator's position must be 300lx.
The operator’s working places are shown in the figure below.
Have a qualified electrician install the power supply (according to EN 60204 Standard). The
power supply must meet the specifications given in the table below.
3-Phase
Volts
Fuse disconnect
Suggested Wire Size
400 VAC
40 A
6 mm
2
maximum length: 15 m
TABLE 3-1
!