Installation Procedure
Wiring Installation for Super Sawmills
Installation Procedure
AS00doc032519
1-21
1
1.5
Wiring Installation for Super Sawmills
1.
If your sawmill is equipped with a previous version Accuset option, skip to Final Assembly
(
IMPORTANT!
If you have a Super model sawmill, follow
the wiring installation instructions located in this section. If
you have a standard model sawmill, follow the wiring instal-
lation instructions found in
Section 1.6 Wiring Installation
.
WARNING!
Before performing any service to the sawmill
control box panel, turn the key to the OFF position, discon-
nect the negative battery lead, and remove all rings,
watches, etc.... Failure to do so may cause serious injury
and machine damage.
See Figure 1-18.
1.
Remove the nut and the existing red upper harness wire from the top post of the top sole-
noid. Remove the nut and the existing black upper harness wire from the top post of the
FIG. 1-18
3H0849-4
Red Upper
Harness Wire
Leave Jumper
Wires In Place
Black Upper
Harness Wire