21
22
21
22
4
12
11
10
9
8
7
6
5
4
3
2
1
20
19
18
17
16
15
14
13
N081
C036
N081
2SY51
2SY51
C036
Plastic block
Screw cover cap
x6
x8
x6
x6
x12
x1
C057
C065
C064
C064
C065
x4
x4
C
C063
C063
x2
x4
B
C038
C039
A
C001
C002
2SY50
2SY50
C070
C070
B08092
2SY53
C071
2SP12
2SP12
C073
2SY59
C042
Sizes
800x800
900x900
755-800
855-900
Tray Finish
4x16
100
%
Level
!
TRAY MUST BE 100% LEVEL IN ALL DIRECTIONS
Ensure the shower tray is level in all directions and is
properly sealed to the wall. The wall must be tiled down to
the top edge of the tray.
Do not angle out bottom tile.
TRAY MUST BE SEALED FULLY AROUND WHERE THE
TRAY MEETS THE WALL.
1
2
2
3
2
Loosen fixed glass panel clip.
Do not remove the screw.
Fix the two fixed panels and upright profiles to
the top bottom rail, using
(N081)
screw.
Note: Fix strengthening block(
C036
)
when assembling the frame.
Step 1
Step 1
Step 1.
Step 2
Ensure top and bottom seals are present on glass,
remove small corner protector if present.
Step 3
10 m
m
4x8
4x11
Magnetic seal
- 6mm masonry drill bit
Put a dab of silicone in the corner between glass
panel and fixed clip.
Remove excess silicone when the upright seals.
Tighten the glass clips.
are fitted (See step 11).